My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Agenda Packet 102225 (1)
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
10-22
>
Planning Commission Agenda Packet 102225 (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 4:35:02 PM
Creation date
12/30/2025 4:30:37 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Dublin/Pleasanton BART Existing Conditions – Access and Circulation <br />June 6, 2025 <br />Page 9 of 24 <br /> <br />Bicycle and Micromobility <br />Biking and micromobility account for a relatively small share of trips at the Dublin/Pleasanton <br />BART Station, similar to the rest of The BART system. <br />All bicyclists observed in the station area during the site visit were on the Iron Horse Trail. Most <br />were travelling south on the Iron Horse Trail, riding on the raised area of the parking lot and <br />sidewalk—spaces shared with pedestrians—to reach the Iron Horse Trail crossing on Owens <br />Drive. The Iron Horse Trail through the station reaches Owens Drive about 120 feet west of the <br />signalized trail crossing. The offset results in southbound bicycles generally riding on the sidewalk <br />to reach the signalized crossing, resulting in potential conflict with pedestrians. (see page 21 <br />regarding the planned improvements to the Iron Horse Trail at the station). <br />Peak hour counts conducted by the City of Pleasanton in May 2024 at the Owens Drive/Iron <br />Horse Trail intersection recorded 9 bicyclists and 13 pedestrians during the AM peak hour, and <br />13 bicyclists and 32 pedestrians during the PM peak hour crossing Owens Drive. <br />Owens Drive along the station frontage provides Class II bike lanes in both directions. Eastbound <br />Owens Drive provides a buffered bike lane along a 650-foot segment east of Willow Road. Along <br />the station frontage, for motor vehicles, Owens Drive provides o ne eastbound through-lane and <br />two westbound through-lanes, which seem adequate for handling observed traffic volumes (258 <br />eastbound and 357 westbound during the AM peak; 603 eastbound and 451 westbound during <br />the PM peak based on May 2024 data). Considering the observed vehicle volumes, westbound <br />Owens Drive may offer opportunities for reallocation of automobile lanes to enhance pedestrian <br />and bicycle infrastructure. <br />The station accommodates bicycle parking for 173 bicycles at the following locations: <br />• Near the station entrance: 56 BikeLink lockers and 24 BART bike lockers <br />• Opposite the station entrance: 35 bike racks and 28 BikeLink lockers <br />• Adjacent to the Dublin Transit Center garage: 30 bike lockers <br />According to BART data from October 2023 to September 2024, the 24 BART bike lockers <br />averaged about 10 rentals per day. BikeLink data for the same period shows that the station’s 84 <br />lockers were used by approximately 192 unique individuals, with each user averaging 15 rentals <br />annually. Weekday use averaged around 10 unique users per day, while weekend use was minimal <br />(fewer than one unique user per day). October 2024 data shows that 12 of these 84 lockers were <br />out of service or low battery during a standard BikeLink site visit; the overall bike parking supply <br />exceeded observed demand. No bike racks were in use at the time of the site visit. Figure 6 <br />shows the location of the bike lockers and bike infrastructure around the Pleasanton side of the <br />station. <br />DRA <br />F <br />T
The URL can be used to link to this page
Your browser does not support the video tag.