My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Agenda Packet 102225 (1)
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
10-22
>
Planning Commission Agenda Packet 102225 (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 4:35:02 PM
Creation date
12/30/2025 4:30:37 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P25-0352, PMC Amendments Planning Commission <br />2 of 9 <br />• PMC Chapter 18.144 (appeals): Modifying the appeal period and clarifying appeal <br />procedures. <br />• Other amendments throughout PMC Title 18 to align with the comprehensive overhauls <br />noted above and clean up the Code. <br /> <br />BACKGROUND <br />In recent years, growing concerns have been raised by City Council members, Planning <br />Commissioners, and the public that the City’s current application review processes are <br />burdensome and not user-friendly. On July 15, 2025, the City Council conducted a workshop <br />to identify its top priorities for the next two Fiscal Years. This direction was affirmed at the City <br />Council’s August 19, 2025, meeting to include, as a priority project, amending the Pleasanton <br />Municipal Code and improving processes to simplify permitting, reduce delays, streamline <br />Design Review, and support business and retail attraction. Further, during the City Council <br />budget discussions this past year, it was identified that the City would be making a series of <br />budget reductions, including to “Internal Services and Operational Support.” With that <br />reduction, it was stated that the City will return to a more limited neighborhood notice <br />requirement, aligned to the requirements of the Government Code rather than the City’s <br />current, very expansive, noticing procedures. <br /> <br />Based on this direction, staff conducted a review and analysis of two key areas for potential <br />improvement: 1) the Design Review process, and 2) the PMC’s noticing, appeals, and call-up <br />procedures more generally. These areas were selected as a priority for assessment because <br />Design Review applications are the most common type of application processed by the City, <br />and, in staff’s observation and experience, the noticing and appeals procedures are a main <br />cause of delays and extended timeframes in project processing. <br /> <br />Permit Types <br />Almost all projects involving physical changes to property require some form of City permit or <br />approval. At a basic level, City approvals include building permits, planning permits, or both. <br />Some of the key elements distinguishing these approvals are outlined below: <br /> <br />Building Permits: <br />• Typically, non-discretionary or “ministerial” in nature <br />• Applications are submitted digitally to the City’s Building & Safety Division, which then <br />routes the permit for review to all necessary City divisions (e.g., Fire, Engineering/Land <br />Development, Planning, Landscape Architecture, and Traffic). <br />• Review limited to evaluation for compliance with respective codes, policies, and <br />adopted plans, typically based on objective standards (e.g., setbacks, height <br />requirements; City-adopted public works standards; parking and traffic thresholds, <br />Building and Fire Codes). <br />• Public noticing is not required. <br /> <br />Planning Permits: <br />• Typically discretionary in nature, with approval based on compliance with PMC- <br />specified findings or criteria. <br />• Planning approval must be secured prior to occupancy and before a project can be <br />submitted to the Building & Safety Division for Building Permits. The approval process <br />varies by permit type, but may be either “administrative” (where the approval body is the
The URL can be used to link to this page
Your browser does not support the video tag.