My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Agenda Packet 102225 (1)
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
10-22
>
Planning Commission Agenda Packet 102225 (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 4:35:02 PM
Creation date
12/30/2025 4:30:37 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P25-0352, PMC Amendments Planning Commission <br />4 of 9 <br />Over the past ten years, staff has processed an average of 110 ADRs annually . A typical ADR <br />takes approximately 3.5 to 7.5 hours to process; on aggregate, this accounts for the equivalent <br />of approximately 20 to 40 percent of a full-time employee (FTE, Associate Planner). This figure <br />does not include hours spent by other City divisions and administrative staff. Over the past five <br />years, staff has processed an average of 42 Design Review applications annually. Hours spent <br />processing DR applications are harder to quantify, since they can vary widely from project to <br />project, and in many cases, applications are processed in tandem with other land use <br />approvals/entitlements. A breakdown of the data can be viewed in Exhibit B. <br /> <br />DR for small residential and commercial projects, which form the largest share of applications <br />processed, can demand almost as much time and resources to process as larger projects. <br />Because even small projects require professionally prepared plans, the DR process <br />particularly burdens homeowners and small business owners. Additionally, staff resources <br />expended are disproportionate to the benefit achieved by subjecting so many small projects to <br />an exhaustive design review process. <br /> <br />Noticing <br />Currently, the public notification radius requirements outlined in PMC Chapter 18.12, <br />throughout PMC Title 18, and specified in adopted City Council Resolution No. 91-132, Exhibit <br />C, far exceed those specified in the Government Code. For projects subject to Planning <br />Commission review and approval, a 1,000-foot radius is used for public noticing, where a 300- <br />foot radius is required by Government Code Sections 65090 and 65091. <br /> <br />Additionally, while not required by Government Code, the City adopted an administrative policy <br />for On-Site Project notification, which was reviewed by the Planning Commission at its May 25, <br />2022, meeting. This requires on-site project notifications for projects or applications that are <br />subject to a public hearing before the Planning Commission or City Council, projects that add <br />one or more dwelling units (excluding ADUs), or other projects at the determination of the <br />Zoning Administrator (ZA). The on-site noticing policy has proven effective and relatively easy <br />for applicants to implement. <br /> <br />For many projects where no public hearing, public notice, or on-site project notification is <br />required (e.g., residential additions subject to Administrative Design Review), the City currently <br />sends out project notification cards to immediately adjacent neighbors. Pursuant to the PMC, <br />the mailed project notification radius is determined on a project-by-project basis and is <br />determined by the ZA. Project notification is intended to allow an opportunity for neighbors <br />near a project to identify concerns or request public hearings prior to ZA approval. Historically, <br />requests for ZA hearings are infrequent (typically five or fewer per year), and are most often <br />made for projects involving second-story additions, balconies where there is a perceived <br />impact on privacy, or where there have been pre-existing conflicts or disagreements between <br />neighbors. ZA hearings rarely result in outright denial of a project, but sometimes result in <br />additional design measures included in a project to address neighbor concerns. <br /> <br />Appeals <br />As outlined in PMC Chapter 18.144, the current appeal process is lengthy and can last 15 to <br />more than 30 days. The effective appeal period can vary substantially from project to project <br />because expiration of the period is based on provisions allowing City Council to review (“call <br />up”) actions of a ZA or Planning Commission decision as specified in PMC Section 18.144.010 <br />(B) and other associated PMC sections. These provisions can cause lengthy delays in
The URL can be used to link to this page
Your browser does not support the video tag.