Laserfiche WebLink
BART Concept Plan Planning Commission <br />8 of 9 <br />regular basis. Of the occupied spaces, about 250 spaces are taken by Pleasanton <br />residents (approximately 18.5 percent of the total parking spaces). The Dublin side of <br />the station also provides opportunities for vehicular parking, between dedicated BART <br />surface and garage spaces, and additional spaces in a recently constructed Alameda <br />County parking garage. Given the densities for residential development and space on <br />the site necessary to accommodate parking for the housing units and any non- <br />residential uses, BART rider parking will be reduced from the existing 1,352 surface <br />spaces. BART policy is also to encourage and prioritize non-vehicular modes of travel, <br />such as pedestrian, bicycle, transit/shuttle, paratransit, and rider pick-up and drop-off. <br />Further evaluation and strategies to offset lost BART rider parking at the station are <br />expected to be forthcoming as part of a focused analysis on parking management and <br />station area access. <br /> <br />• Non-residential Uses: The site would principally consist of residential development, but <br />the project team felt it desirable to also evaluate the range of potential non -residential <br />uses that could be located on the site. Active uses, especially located adjacent to the <br />plaza, would help to activate the area and contribute to overall vitality and ambiance of <br />the station. The market assessment and analysis indicate that these active uses could <br />include local-serving retail or personal services. Other potential u ses that are not <br />currently found in north Pleasanton include educational facilities, community spaces or <br />a public facility such as a self-serve library or flexible space. While generally not <br />considered an active use, a medical office could also be considered. Future planning <br />and phasing of the project could yield that the non-residential uses be constructed later <br />in the market cycle when support for other uses, such as hotel, is possible. <br /> <br />WORK SESSION <br />Staff requests input and feedback from the Planning Commission regarding these site <br />development options. While the options are preliminary at this stage, feedback from the <br />Commission (and City Council) would be incorporated into a Concept Plan document to <br />provide guidance for the site's development and facilitate BART issuing an RFP to develop it. <br /> <br />Discussion Question 1: Does the Planning Commission have any comments regarding the <br />range of development represented in the site development <br />scenarios (e.g., building height, maximum units)? <br /> <br />Discussion Question 2: Does the Planning Commission have any feedback on any of the <br />other topics included in this report (e.g., plaza, non-residential uses, <br />etc.)? <br /> <br />Discussion Question 3: Does the Planning Commission have any other feedback that it <br />would like incorporated into the Concept Plan? <br /> <br />SCHEDULE AND NEXT STEPS <br />The Concept Plan is intended to be completed by Spring of 2026, such that the site re-use <br />options have been vetted by the community and adopted by City Council, and a second MOU <br />with BART is in place and ready for future advancement to facilitate development of the site. At