My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Agenda Packet 102225 (1)
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
10-22
>
Planning Commission Agenda Packet 102225 (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 4:35:02 PM
Creation date
12/30/2025 4:30:37 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BART Concept Plan Planning Commission <br />8 of 9 <br />regular basis. Of the occupied spaces, about 250 spaces are taken by Pleasanton <br />residents (approximately 18.5 percent of the total parking spaces). The Dublin side of <br />the station also provides opportunities for vehicular parking, between dedicated BART <br />surface and garage spaces, and additional spaces in a recently constructed Alameda <br />County parking garage. Given the densities for residential development and space on <br />the site necessary to accommodate parking for the housing units and any non- <br />residential uses, BART rider parking will be reduced from the existing 1,352 surface <br />spaces. BART policy is also to encourage and prioritize non-vehicular modes of travel, <br />such as pedestrian, bicycle, transit/shuttle, paratransit, and rider pick-up and drop-off. <br />Further evaluation and strategies to offset lost BART rider parking at the station are <br />expected to be forthcoming as part of a focused analysis on parking management and <br />station area access. <br /> <br />• Non-residential Uses: The site would principally consist of residential development, but <br />the project team felt it desirable to also evaluate the range of potential non -residential <br />uses that could be located on the site. Active uses, especially located adjacent to the <br />plaza, would help to activate the area and contribute to overall vitality and ambiance of <br />the station. The market assessment and analysis indicate that these active uses could <br />include local-serving retail or personal services. Other potential u ses that are not <br />currently found in north Pleasanton include educational facilities, community spaces or <br />a public facility such as a self-serve library or flexible space. While generally not <br />considered an active use, a medical office could also be considered. Future planning <br />and phasing of the project could yield that the non-residential uses be constructed later <br />in the market cycle when support for other uses, such as hotel, is possible. <br /> <br />WORK SESSION <br />Staff requests input and feedback from the Planning Commission regarding these site <br />development options. While the options are preliminary at this stage, feedback from the <br />Commission (and City Council) would be incorporated into a Concept Plan document to <br />provide guidance for the site's development and facilitate BART issuing an RFP to develop it. <br /> <br />Discussion Question 1: Does the Planning Commission have any comments regarding the <br />range of development represented in the site development <br />scenarios (e.g., building height, maximum units)? <br /> <br />Discussion Question 2: Does the Planning Commission have any feedback on any of the <br />other topics included in this report (e.g., plaza, non-residential uses, <br />etc.)? <br /> <br />Discussion Question 3: Does the Planning Commission have any other feedback that it <br />would like incorporated into the Concept Plan? <br /> <br />SCHEDULE AND NEXT STEPS <br />The Concept Plan is intended to be completed by Spring of 2026, such that the site re-use <br />options have been vetted by the community and adopted by City Council, and a second MOU <br />with BART is in place and ready for future advancement to facilitate development of the site. At
The URL can be used to link to this page
Your browser does not support the video tag.