Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br />MEMORANDUM <br /> <br />Date: November 10, 2025 <br /> <br />To: Members of the Planning Commission <br /> <br />From: Diego Mora, AICP, Associate Planner <br /> <br />Re: Item 5 <br />P23-0563, Tract 8749, <br />4400 Black Avenue <br /> <br /> <br /> <br />Following the publication of the agenda report and attachments for Item 5, staff received <br />Exhibit D from FirstCarbon Solutions (FCS) referred to as the “AB 130 Memorandum” <br />(attached). As described in the agenda report, the AB 130 Memorandum verifies the eligibility <br />of the proposed project for a California Environmental Quality Act (CEQA) exemption pursuant <br />to Assembly Bill 130 (AB 130). <br /> <br />Additionally, there is a minor correction to a reference on page 5 of the agenda report. The <br />correction in the first paragraph of page 5 i s shown below with strikethrough and redline: <br /> <br />“The applicant has requested a total of 27 waivers, two of which pertain to site development <br />standards, including lot width and building height from the ODS, which are summarized in <br />Table 2 below Exhibit F attached.” <br /> <br /> <br /> <br /> <br /> Diego Mora <br />Associate Planner <br /> <br /> <br />