My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Supplemental Materials 11-12-25 (2)
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
11-12
>
Planning Commission Supplemental Materials 11-12-25 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 4:54:07 PM
Creation date
12/30/2025 4:39:53 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
866
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2 <br />• Project Applicant: TTLC Pleasanton–Black Ave., LLC <br />• Project Location: 4400 Black Avenue, Pleasanton, California (APN: 946-3380-6) (Exhibit 1) <br />• Land Use Designation: Other Public and Institutional, Housing Element Sites Overlay. <br />• Zoning: Public and Institutional District, Housing Opportunity Zone (HOZ) District <br />• Area: The project site area is 2.59 acres, and the building (residential) area is 96,584 square feet. <br />• Building Configuration: 10 three-story buildings: seven buildings would include five <br />condominiums and three buildings would include eight condominiums; and 7 accessory dwelling <br />units (ADUs) for long-term residential use. (Exhibit 2) <br />• Maximum Height: 42 feet <br />• Density: 22.8 to 25.5 units per acre (based on at least 59 and up to 66 units on 2.59 acres) <br />• Access, Parking, and Site Features: The proposed project would be accessed via a 26-foot-wide <br />driveway along Black Avenue. Internal circulation would be provided via an internal street, three <br />driveways, and one elongated driveway along the southern boundary of the site. <br />Pedestrian access would be provided to the proposed project via a 6-foot-wide paseo walkway <br />along the eastern boundary of the site, which would connect to both Black Avenue and the <br />southern boundary of the project site. Four 6-foot-wide walkways would be constructed within the <br />inner courtyards, in addition to 5-foot sidewalks running parallel to the inner street of the project <br />site. <br />A total of 127 parking spaces would be provided (each townhome would have access to either a <br />two-car garage or tandem private garage). A total of 28 bicycle parking spaces would be provided <br />throughout the project site between various courtyards and driveway access points. Each unit <br />would also be afforded one space of garage bicycle storage per unit <br />• Landscaping and Open Space: Landscaping would be included throughout the site, specifically <br />around and between the proposed buildings. The outer perimeter of the project site would preserve <br />existing mature trees and add new street trees along Black Avenue. In addition, interior trees would <br />be placed within the proposed courtyards and screening trees would be placed along the outer <br />edge of the landscaped areas lining the eastern and western edges of the project site. <br />A bioretention basin would be located at the western project site boundary and would be designed <br />to filter stormwater in accordance with C.3 requirements. <br />The proposed project would include 8,232 square feet of private open space and 13,636 square <br />feet of group open space. <br />• Utilities: The proposed project would include connection to existing water lines within Black <br />Avenue as well as the construction of new water and sewer pipes along the internal roadway of the <br />project site. Water service would be provided by the City and sewer service would be provided by <br />the Dublin San Ramon Services District (DSRSD). <br />Stormwater would be managed through a network of proposed storm drainpipes which would drain <br />into a bioretention basin along the western project site boundary or, in the case of overflow events, <br />be collected and funneled to the existing drainage system under Black Avenue.
The URL can be used to link to this page
Your browser does not support the video tag.