|
CITY OF PLEASANTON TTCASANJ011431.2025 A-2
<br />PROPOSAL FOR
<br />CITY OF PLEASANTON
<br />QUIET ZONE
<br />Peter has nearly 25 years of engineering experience as a project
<br />manager and project scoping team leader in California and Nevada, primarily focused
<br />on transportation and transit design, including quiet zone design and at-grade rail
<br />crossings, multimodal design and circulation, site civil design, pedestrian and American
<br />with Disabilities Act (ADA) access improvements, roadway design, traffic signal design,
<br />agency/stakeholder coordination, and utility design. Peter is currently supporting
<br />design for over two dozen at- grade crossings in Northern California and Nevada and is also leading the third phase of
<br />a statewide inventory and survey for 755 signalized and active rail crossings (including UPRR crossings) in California for
<br />CPUC. Peter has extensive experience coordinating with CPUC and UPRR, and also brings a thorough understanding
<br />of design considerations to the coordination process. His additional recent experience includes the Vasona Double
<br />Track Study and Conceptual Engineering project for VTA, San Diego Association of Governments (SANDAG) South Line
<br />Freight Improvement Project, Metro Willowbrook Rosa Parks Transit Center, and leading a Kimley-Horn team of 40+
<br />engineers on the SANDAG Mid-Coast Corridor Transit Project.
<br />RELEVANT EXPERIENCE
<br /> ◢City of Menlo Park, Quiet Zone Feasibility Study, Menlo Park, CA – Principal-in-Charge
<br /> ◢City of Palo Alto, Caltrain Railroad Gates Quiet Zone Analysis and Study, Palo Alto, CA
<br />– Principal-in-Charge
<br /> ◢City of Palo Alto, Alma Street At-Grade Rail Crossing Quiet Zone Design, Palo Alto, CA
<br />– Project Manager
<br /> ◢Alameda CTC, RSEP Environmental and At-Grade Crossing Design Services, Oakland, CA – Task
<br />Lead, Rail Crossing Design
<br /> ◢East Bay Regional Park District (EBRPD), Berrellesa At-Grade Rail Crossing, Martinez, CA
<br />– Project Manager
<br /> ◢CCTA, SF Bay Trail Gap Closure At-Grade Crossing, Martinez, CA – Project Manager
<br /> ◢CPUC, Phase I Railroad Crossing Inventory and Field Survey, Statewide, CA – Project Manager
<br /> ◢CPUC, Phase 3 - Railroad Crossing Inventory and Field Survey, Statewide, CA – Project Manager
<br /> ◢Nevada Department of Transportation (NDOT), Railway - Highway Grade Crossings Design and
<br />Pedestrian Improvements, Statewide (Multiple Locations), NV – Project Manager
<br /> ◢City of Milpitas, Pavement Rehab 2023/2024/2025, Milpitas, CA– Principal-in-Charge
<br /> ◢City of Mountain View, Castro Street Pedestrian Improvements, Mountain View,
<br />CA– Principal-in-Charge
<br /> ◢SANDAG, Mid-Coast Corridor Transit Project, Phase 1 (Mid-Coast Light Rail Transit), San Diego,
<br />CA – Project Manager
<br /> ◢SANDAG, Final Design of the South Line Freight Rail Improvements, San Diego, CA
<br />– Project Manager
<br /> ◢Metropolitan Transit System (MTS), Station Improvements at 12th and Imperial Transit Center,
<br />San Diego, CA – Project Manager
<br /> ◢Metro, Willowbrook/Rosa Parks Station Improvement Project Rail Crossing Design and
<br />Engineering Services, Los Angeles, CA – Project Manager
<br /> ◢Foothill Transit, Planning and Design Services for West Covina Transit Center, West Covina, CA
<br />– Project Manager
<br />PETER MEYERHOFER, PE
<br />Principal-in-Charge
<br />EDUCATION
<br />• Bachelor of Science, Civil
<br />Engineering, University of Arizona
<br />CREDENTIALS
<br />• Professional Engineer in California
<br />#68778 and Nevada #018093
<br />LOCATION
<br />• Portland, Oregon
<br />Docusign Envelope ID: 2430EB25-F48A-45D4-91C5-9340C4FBB5C9
|