DE
<br />S
<br />I
<br />G
<br />N
<br />
<br />F
<br />O
<br />C
<br />U
<br />S
<br />LA
<br />N
<br />D
<br />S
<br />C
<br />A
<br />P
<br />E
<br />
<br />A
<br />R
<br />C
<br />H
<br />I
<br />T
<br />E
<br />C
<br />T
<br />U
<br />R
<br />E
<br /> &
<br />
<br />C
<br />O
<br />N
<br />S
<br />T
<br />R
<br />U
<br />C
<br />T
<br />I
<br />O
<br />N
<br />DESIGN
<br />FOCUS
<br />PO BOX 485
<br />BEN LOMOND, CA 95005
<br />(831) 336-3100
<br />47
<br />5
<br />
<br />&
<br />
<br />4
<br />9
<br />3
<br />
<br />S
<br />T
<br />.
<br />
<br />J
<br />O
<br />H
<br />N
<br />PL
<br />E
<br />A
<br />S
<br />A
<br />N
<br />T
<br />O
<br />N
<br />,
<br />
<br />C
<br />A
<br />REVISED: 10/10/2025
<br />DESIGN BY: 4Binc.
<br />DRAWN BY: 4Binc.
<br />SCALE: NTS
<br />IR2.6
<br />IR
<br />R
<br />I
<br />G
<br />A
<br />T
<br />I
<br />O
<br />N
<br /> N
<br />O
<br />T
<br />E
<br />S
<br />SUBMITTALS
<br />A. SEE THE CONTRACT GENERAL CONDITIONS FOR POLICY AND PROCEDURES RELATED TO SUBMITTALS.
<br />B. PRODUCT DATA
<br />1. SUBMIT A MINIMUM OF (3) COMPLETE LISTS OF ALL IRRIGATION EQUIPMENT TO BE USED, MANUFACTURER'S
<br />BROCHURES, MAINTENANCE MANUALS, WARRANTEES AND OPERATING INSTRUCTIONS, WITHIN 15 DAYS AFTER THE
<br />NOTICE TO PROCEED.
<br />A. THIS SUBMISSION MAY BE DONE DIGITALLY AND ALL DOCUMENTS SHALL BE SUBMITTED IN ONE PDF DOCUMENT.
<br />2. THE SUBMITTALS SHALL BE PACKAGED AND PRESENTED IN AN ORGANIZED MANNER, IN THE QUANTITY DESCRIBED
<br />IN DIVISION 1 OF THE SPECIFICATIONS. PROVIDE A TABLE OF CONTENTS OF ALL SUBMITTED ITEMS.
<br />3. CLEARLY IDENTIFY ON EACH SUBMITTED SHEET BY UNDERLINING OR HIGHLIGHTING (ON EACH COPY) THE SPECIFIC
<br />PRODUCT BEING SUBMITTED FOR APPROVAL. FAILURE TO CLEARLY IDENTIFY THE SPECIFIC PRODUCT BEING
<br />SUBMITTED WILL RESULT IN A REJECTION FOR THE ENTIRE SUBMITTAL. NO SUBSTITUTIONS OF MATERIAL OR
<br />PROCEDURES SHALL BE MADE CONCERNING THESE DOCUMENTS WITHOUT THE WRITTEN CONSENT OF AN
<br />ACCEPTED EQUIVALENT BY THE OWNER’S REPRESENTATIVE.
<br />4. EQUIPMENT OR MATERIALS INSTALLED OR FURNISHED WITHOUT PRIOR APPROVAL OF THE OWNER’S
<br />REPRESENTATIVE, MAY BE REJECTED BY THE OWNER’S REPRESENTATIVE AND THE CONTRACTOR SHALL BE REQUIRED
<br />TO REMOVE SUCH MATERIALS FROM THE SITE AT THEIR OWN EXPENSE.
<br />AS BUILT RECORD SET OF DRAWINGS
<br />A. IMMEDIATELY UPON THE INSTALLATION OF ANY BURIED PIPE OR EQUIPMENT, THE CONTRACTOR SHALL INDICATE
<br />ON THE PROGRESS RECORD DRAWINGS THE LOCATIONS OF SAID PIPE OR EQUIPMENT. THE PROGRESS RECORD
<br />DRAWINGS SHALL BE MADE AVAILABLE AT ANY TIME FOR REVIEW BY THE OWNER'S REPRESENTATIVE.
<br />B. BEFORE FINAL ACCEPTANCE OF WORK, THE CONTRACTOR SHALL PROVIDE AN AS BUILT RECORD SET OF DRAWINGS
<br />SHOWING THE IRRIGATION SYSTEM WORK AS BUILT. THE DRAWINGS SHALL BE TRANSMITTED TO THE OWNER'S
<br />REPRESENTATIVE IN PAPER FORMAT AND AS A PDF FILE OF EACH DOCUMENT ON COMPACT DISK OR FLASH DRIVE.
<br />THE DRAWINGS SHALL INCLUDE ALL INFORMATION SHOWN ON THE ORIGINAL CONTRACT DOCUMENT AND REVISED
<br />TO REFLECT ALL CHANGES IN THE WORK. THE DRAWINGS SHALL INCLUDE THE FOLLOWING ADDITIONAL
<br />INFORMATION
<br />1. ALL VALVES SHALL BE NUMBERED BY STATION AND CORRESPONDING NUMBERS SHALL BE SHOWN ON THE AS BUILT
<br />RECORD SET OF DRAWINGS.
<br />2. ALL MAIN LINE PIPE OR IRRIGATION EQUIPMENT INCLUDING SLEEVES, VALVES, CONTROLLERS, IRRIGATION WIRE
<br />RUNS WHICH DEVIATE FROM THE MAINLINE LOCATION, BACKFLOW PREVENTERS, REMOTE CONTROL VALVES,
<br />GROUNDING RODS, SHUT-OFF VALVES, RAIN SENSORS, WIRE SPLICE LOCATIONS, AND QUICK COUPLING VALVES
<br />SHALL BE LOCATED BY TWO (2) MEASURED DIMENSIONS, TO THE NEAREST ONE-HALF FOOT. DIMENSIONS SHALL BE
<br />GIVEN FROM PERMANENT OBJECTS SUCH AS BUILDINGS, SIDEWALKS, CURBS, WALLS, STRUCTURES AND DRIVEWAYS.
<br />ALL CHANGES IN DIRECTION AND DEPTH OF MAIN LINE PIPE SHALL BE NOTED EXACTLY AS INSTALLED. DIMENSIONS
<br />FOR PIPES SHALL BE SHOWN AT NO GREATER THAN A 50 FT. MAXIMUM INTERVAL.
<br />3. AS BUILT RECORD SET OF DRAWINGS SHALL BE SIGNED AND DATED BY THE CONTRACTOR ATTESTING TO AND
<br />CERTIFYING THE ACCURACY OF THE AS BUILT RECORD SET OF DRAWINGS. AS BUILT RECORD SET OF DRAWINGS
<br />SHALL HAVE "AS BUILT RECORD SET OF DRAWINGS”, COMPANY NAME, ADDRESS, PHONE NUMBER AND THE NAME
<br />OF THE PERSON WHO CREATED THE DRAWING AND THE CONTACT NAME (IF DIFFERENT).
<br />C. THE OWNER SHALL MAKE THE ORIGINAL CONTRACT DRAWING FILES AVAILABLE TO THE CONTRACTOR.
<br />CONTROLLER CHARTS:
<br />A. PROVIDE ONE CONTROLLER CHART FOR EACH AUTOMATIC CONTROLLER INSTALLED.
<br />1. ON THE INSIDE SURFACE OF THE COVER OF EACH AUTOMATIC CONTROLLER, PREPARE AND MOUNT A COLOR-CODED
<br />CHART SHOWING THE VALVES, MAIN LINE, AND SYSTEMS SERVICED BY THAT PARTICULAR CONTROLLER. ALL VALVES
<br />SHALL BE NUMBERED TO MATCH THE OPERATION SCHEDULE AND THE DRAWINGS. ONLY THOSE AREAS
<br />CONTROLLED BY THAT CONTROLLER SHALL BE SHOWN. THIS CHART SHALL BE A PLOT PLAN, ENTIRE OR PARTIAL,
<br />SHOWING BUILDING, WALKS, ROADS AND WALLS. THE PLAN, REDUCED AS NECESSARY AND LEGIBLE IN ALL DETAILS,
<br />SHALL BE MADE TO A SIZE THAT WILL FIT INTO THE CONTROLLER COVER. THIS PRINT SHALL BE APPROVED BY THE
<br />OWNER'S REPRESENTATIVE AND SHALL BE PROTECTED IN LAMINATED IN A PLASTIC COVER AND BE SECURED TO THE
<br />INSIDE BACK OF THE CONTROLLER CABINET DOOR.
<br />2. THE CONTROLLER CHART SHALL BE COMPLETED AND APPROVED PRIOR TO ACCEPTANCE OF THE WORK.
<br />EQUIPMENT
<br />1. ALL POP-UP TYPE SPRINKLER HEADS INSTALLED IN SHRUB OR GROUNDCOVER AREAS SHALL BE INSTALLED SO
<br />THAT THE TOP OF THE SPRINKLER HEAD IS 2" ABOVE FINISH GRADE.
<br />2. ALL POP-UP TYPE SPRINKLER HEADS INSTALLED IN TURF AREAS SHALL BE INSTALLED SO THAT THE TOP OF
<br />THE SPRINKLER HEAD IS FLUSH WITH ADJACENT SIDEWALK OR CURB.
<br />3. ALL SPRINKLER HEADS SHALL BE SET PERPENDICULAR TO FINISH GRADE OF THE AREA TO BE IRRIGATED
<br />UNLESS OTHERWISE DESIGNATED ON THE PLANS.
<br />4. ALL SPRINKLERS SHALL BE INSTALLED WITH A 'CHECK VALVE' TO PREVENT DRAINAGE FROM SPRINKLER HEAD
<br />WHEN THE SPRINKLER IS OFF. DRAINAGE OF IRRIGATION WATER THROUGH SPRINKLER HEADS WILL NOT BE
<br />ALLOWED.
<br />5. THE SPRINKLER SYSTEM DESIGN IS BASED ON THE MINIMUM EQUIPMENT OPERATING PRESSURE OF
<br /> 65 PSI AND THE MAXIMUM FLOW OF 5.89 GPM AS SHOWN ON THE IRRIGATION DRAWINGS AT THE METER
<br />OR POINT OF CONNECTION. THE IRRIGATION CONTRACTOR SHALL VERIFY WATER PRESSURE PRIOR TO
<br />CONSTRUCTION. REPORT ANY DIFFERENCE BETWEEN THE WATER PRESSURE IRRIGATION POINT OF
<br />CONNECTION TO THE OWNER'S AUTHORIZED REPRESENTATIVE. IN THE EVENT THAT PRESSURE DIFFERENCES
<br />ARE NOT REPORTED PRIOR TO THE START OF CONSTRUCTION, THE IRRIGATION CONTRACTOR SHALL ASSUME
<br />FULL RESPONSIBILITY FOR ANY REVISIONS NECESSARY.
<br />6. 120 VOLT ELECTRICAL POWER OUTLET AT THE AUTOMATIC CONTROLLER LOCATION SHALL BE PROVIDED BY
<br />OTHERS. IT SHALL BE THE RESPONSIBILITY OF THE IRRIGATION CONTRACTOR TO MAKE THE FINAL HOOK-UP
<br />FROM THE ELECTRICAL OUTLET TO THE AUTOMATIC CONTROLLER.
<br />7. ALL MASTER VALVES/FLOW SENSORS MUST BE SET UP PRIOR TO IRRIGATION CONTROLLER CERTIFICATION.
<br />8. THIS DESIGN IS DIAGRAMMATIC. ALL PIPING, VALVES, ETC. SHOWN WITHIN PAVED AREAS IS FOR DESIGN
<br />CLARIFICATION ONLY AND SHALL BE INSTALLED IN PLANTING AREAS. AVOID ANY CONFLICTS BETWEEN THE
<br />SPRINKLER SYSTEM, PLANTING AND ARCHITECTURAL FEATURES.
<br />9. THE IRRIGATION CONTRACTOR SHALL FLUSH AND ADJUST ALL SPRINKLER HEADS FOR OPTIMUM
<br />PERFORMANCE AND TO PREVENT OVER-SPRAY ONTO WALKS, ROADWAYS AND/OR BUILDINGS AS MUCH AS
<br />POSSIBLE. THIS SHALL INCLUDE SELECTING THE BEST DEGREE OF ARC TO FIT THE EXISTING SITE CONDITIONS
<br />AND TO THROTTLE THE FLOW CONTROL AT EACH VALVE TO OBTAIN THE OPTIMUM OPERATING PRESSURE
<br />FOR EACH SYSTEM.
<br />10. DO NOT WILLFULLY INSTALL THE SPRINKLER SYSTEM AS SHOWN ON THE DRAWINGS WHEN IT IS OBVIOUS IN
<br />THE FIELD THAT OBSTRUCTIONS, GRADE DIFFERENCES OR DIFFERENCES IN THE AREA DIMENSIONS EXIST
<br />THAT MIGHT NOT HAVE BEEN CONSIDERED IN THE ENGINEERING. SUCH OBSTRUCTIONS OR DIFFERENCES
<br />SHOULD BE BROUGHT TO THE ATTENTION OF THE OWNER'S AUTHORIZED REPRESENTATIVE. IN THE EVENT
<br />THAT THIS NOTIFICATION IS NOT PERFORMED, THE IRRIGATION CONTRACTOR SHALL ASSUME FULL
<br />RESPONSIBILITY FOR ANY REVISIONS NECESSARY.
<br />11. INSTALL ALL DRIP FLUSH VALVES AND DRIP INDICATORS AT HIGHEST POINT IN DRIP SYSTEM TO AVOID LOW
<br />HEAD DRAINAGE.
<br />12. INSTALL ALL PIPE MATERIALS AND EQUIPMENT AS SHOWN IN THE DETAILS. USE TEFLON TAPE OR TEFLON
<br />PIPE DOPE ON ALL PVC MALE PIPE THREADS ON ALL SPRINKLER SWING JOINT AND VALVE ASSEMBLIES.
<br />13. IT IS THE RESPONSIBILITY OF THE IRRIGATION CONTRACTOR TO FAMILIARIZE SELF WITH ALL GRADE
<br />DIFFERENCES, LOCATION OF WALLS, RETAINING WALLS, ETC. HE SHALL COORDINATE HIS WORK WITH THE
<br />GENERAL CONTRACTOR AND OTHER SUB- CONTRACTORS FOR THE LOCATION AND THE INSTALLATION OF
<br />PIPE SLEEVES THROUGH WALLS, UNDER ROADWAYS, PAVING, STRUCTURES, ETC.
<br />14. IN ADDITION TO THE CONTROL WIRE SLEEVES SHOWN ON THE DRAWINGS, THE IRRIGATION CONTRACTOR
<br />SHALL BE RESPONSIBLE FOR THE INSTALLATION OF CONTROL WIRE SLEEVES OF SUFFICIENT SIZE UNDER ALL
<br />OTHER PAVED AREAS.
<br />15. CONTRACTOR SHALL PROGRAM IRRIGATION CONTROLLER TO OPERATE AS FOLLOWS POST-CONSTRUCTION:
<br />SPRAY VALVES SHALL ONLY BE TURNED ON BETWEEN THE HOURS OF 08:00 P.M. AND 6:00 A.M. BUBBLER
<br />AND DRIP VALVES CAN OPERATE AT ANY TIME.
<br />SYSTEM PERFORMANCE VERIFICATION
<br />1. PRE SOD/SEED INSTALLATION - CONTRACTOR TO HIRE AN IRRIGATION AUDITOR TO CONDUCT A CATCH CAN
<br />TEST OF ALL ROTOR ZONES OF SPORTSFIELD/PARK AREAS. TEST RESULTS TO BE NOTED AND RECORDED AT
<br />EACH CATCH CAN. BASED ON IRRIGATION AUDITORS REPORT, ADJUSTMENTS TO HEAD LAYOUT OR NOZZLING
<br />MUST BE MADE PRIOR TO THE INSTALLATION OF SOD OR SEED. ALL FINDINGS MUST BE SENT TO THE
<br />LANDSCAPE ARCHITECT.
<br />2. PER MWELO, IRRIGATION HEADS MUST BE PLACED SO THAT HARDSCAPED AREAS DRAIN TOWARD
<br />LANDSCAPED AREAS, AND WITH NO OVERSPRAY. OTHERWISE A SETBACK FROM HARDSCAPE OF 24"
<br />MINIMUM IS REQUIRED.
<br />3. ALL LANDSCAPE AUDITS SHALL BE CONDUCTED BY A THIRD PARTY CERTIFIED LANDSCAPE IRRIGATION
<br />AUDITOR.
<br />4. THE PROJECT APPLICANT SHALL SUBMIT AN IRRIGATION AUDIT REPORT WITH THE CERTIFICATE OF
<br />COMPLETION TO THE RESPONSIBLE LOCAL AGENCY PER MWELO REQUIREMENTS.
<br />GENERAL IRRIGATION NOTES
<br />IRRIGATION/WATERING RESPONSIBILITY
<br />1. IT IS THE RESPONSIBILITY OF THE MAINTENANCE CONTRACTOR TO OPERATE THE IRRIGATION SYSTEM IN AN EFFICIENT
<br />MANNER AND TO MINIMIZE WATER WASTE. IT IS THE MAINTENANCE CONTRACTOR'S RESPONSIBILITY TO ADJUST THE SYSTEM
<br />TO APPLY WATER IN ACCORDANCE WITH PLANT REQUIREMENTS BASED ON WEATHER, SOIL, AND SITE CONDITIONS. THE
<br />IRRIGATION PROGRAM SHALL BE SCHEDULED TO MINIMIZE WATER WASTE THROUGH RUNOFF, EXCESSIVE IRRIGATION RUN
<br />TIMES, UTILIZE CYCLE SOAK SCHEDULING WHEN APPLICABLE. IT IS THE RESPONSIBILITY OF THE MAINTENANCE CONTRACTOR TO
<br />OPERATE THE IRRIGATION SYSTEM BASED ON LOCAL MUNICIPAL GUIDELINES.
<br />IRRIGATION ACTIVATION
<br />1. ACTIVATE IRRIGATION SYSTEM IN SPRING (OR WHEN WEATHER PERMITS). CHARGE MAINLINE IN FEBRUARY OR MARCH TO
<br />CHECK FOR LEAKS AND/OR MALFUNCTIONING VALVES.
<br />2. TURN ON BACKFLOW PREVENTERS, OPEN GATE VALVES AND ACTIVATE BOOSTER PUMPS IF INSTALLED.
<br />3. THE IRRIGATION CONTROLLER TO RUN MODE AND VERIFY THAT ALL PROGRAMS ARE ACTIVATED AND SET UP TO BE RUN IN
<br />SELF ADJUSTED MODE.
<br />4. VERIFICATION AND ADJUSTMENTS. THIS INCLUDES TURNING ON EACH ZONE, MONITORING FOR LEAKS OR MALFUNCTIONING
<br />PARTS, CUTTING GRASS AWAY FROM SPRINKLER HEADS AND ADJUSTING SPRINKLERS FOR PROPER ARC AND MAXIMUM
<br />EFFICIENCY.
<br />5. VERIFY THAT DRIP IRRIGATION IS FUNCTIONAL AND THAT DISTRIBUTION TUBING HAS NOT BEEN CUT OR BROKEN DURING
<br />NON OPERATIONAL PERIOD.
<br />6. SERVICE, CLEAN AND ADJUST AND WEATHER SENSOR SYSTEM. THIS IS CRITICAL FOR ALL SELF ADJUSTING CONTROLLERS.
<br />7. IF APPLICABLE SERVICE IRRIGATION BOOSTER PUMP, THIS NEED TO BE COMPLETED BY THE MANUFACTURERS CERTIFIED
<br />TECHNICIAN.
<br />8. IRRIGATION MONITORING/LANDSCAPE WATERING
<br />9. CHECK THE ET/WEATHER BASED SELF ADJUSTING SYSTEM PROGRAMMING, FLOW SENSOR AND MASTER VALVE OPERATION
<br />AND PROGRAMMING; ADJUST AS REQUIRED TO ENSURE PROPER OPERATION.
<br />10. ALL BACKFLOW PREVENTION DEVICES ARE TO BE MAINTAINED AS PER LOCAL CITY OR COUNTY CODES.
<br />11. ALL TURF AREAS SHALL BE MONITORED TO DETERMINE THE NEED FOR SUPPLEMENTAL IRRIGATION. FREQUENCY AND
<br />DURATION OF EACH WATERING WILL BE DEPENDENT ON LOCAL WEATHER CONDITIONS. TO DETERMINE THE NEED FOR
<br />WATERING, LANDSCAPE MAINTENANCE CONTRACTOR SHALL USE A SOIL PROBE TO EXAMINE THE FIRST 6-12” OF THE SOIL
<br />PROFILE. IF THE SOIL IS COOL, DAMP AND HOLDS ITS SHAPE, WATERING IS NOT NECESSARY. PLANT MATERIAL ROOTS SHOULD BE
<br />ENCOURAGE TO ROOT AS DEEP AS POSSIBLE, THIS IS ACCOMPLISHED BY DEEP ROOT WATERING, LONGER IRRIGATION RUN TIMES
<br />AND UTILIZING CYCLE SOAK METHOD. FREQUENT SHALLOW IRRIGATION SCHEDULING IS INEFFECTIVE AND WILL ONLY PROMOTE
<br />SHALLOW ROOTING AND REQUIRE EXCESSIVE WATER WASTE.
<br />12. GROUNDCOVER AND SHRUB BEDS SHALL BE WATERED USING AN AUTOMATIC IRRIGATION SYSTEM. THE ENTIRE
<br />GROUNDCOVER/SHRUB BED SHALL BE SOAKED TO A DEPTH TO MAXIMIZE HEALTHY PLANT ROOT GROWTH. IRRIGATION RUN
<br />TIME TO BE BASED ON IRRIGATION DEVICE PRECIPITATION RATE (NOT FLOW RATE) AND PLANT MATERIAL IRRIGATION DEMAND.
<br />(USE WUCOLS REFERENCE FOR PLANT WATERING NEEDS). IN THE EVENT OF ESTABLISHING PLANTS, OR COMPROMISED SOIL
<br />PROFILE, WATERING FREQUENCIES MAY BE ADJUSTED.
<br />13. ESTABLISH TIME SETTINGS AND INTERVALS OF IRRIGATION WATER APPLICATION FOR EACH VALVE OF ALL IRRIGATION
<br />ZONES. MAKE ADJUSTMENTS WHEN NECESSARY TO CORRESPOND TO VARIABLE WATERING REQUIREMENTS. CHECK FOR
<br />COVERAGE AND PLUGGED EMISSION/NOZZLE DEVICES. CLEAN DEVICES AND ADJUST DEVICES WHILE MAINTAINING THE SYSTEM
<br />IN PROPER WORKING ORDER.
<br />14. ALL AUTOMATIC CONTROLLERS WILL BE PROGRAMMED TO APPLY WATER DURING HOURS AS PERMITTED BY LOCAL TOWN,
<br />CITY OR COUNTY ORDINANCES.
<br />IRRIGATION SYSTEM REPAIR
<br />1. CLEANING AND ADJUSTING THE SPRINKLERS HEADS ARE THE MAINTENANCE CONTRACTOR'S RESPONSIBILITY. REPAIR
<br />AND/OR REPLACEMENT OF ANY VANDALIZED OR MALFUNCTIONING COMPONENT BEYOND MAINTENANCE CONTRACTOR'S
<br />CONTROL IS THE RESPONSIBILITY OF THE OWNER/AGENT. ANY DAMAGE CAUSED BY MAINTENANCE CONTRACTOR WILL BE
<br />REPAIRED BY MAINTENANCE CONTRACTOR AT NO COST TO THE OWNER/AGENT.
<br />2. ALL IRRIGATION REPAIRED OR REPLACED MUST BE IN ACCORDANCE WITH THE ORIGINAL IRRIGATION DESIGN, LOCAL CITY OR
<br />COUNTY GUIDELINES AND MUST PROVIDE THE MAXIMUM EFFICIENCY AS POSSIBLE SO AS NOT TO WASTE WATER.
<br />3. ALL DRIP SYSTEMS ARE TO BE MANUALLY FLUSHED A MINIMUM ONE TIME PER YEAR AND FILTERS TO BE CLEANED ON A
<br />REGULAR BASIS.
<br />4. ALL DAMAGED AND REPAIRED PIPE MUST BE FLUSHED OF ALL DEBRIS. MAINTENANCE CONTRACTOR TO GUARANTEE FULL
<br />OPERATIONAL AND EFFICIENT PERFORMANCE OF REPAIRED SYSTEMS.
<br />5. OREPAIRS TO BACKFLOW PREVENTION DEVICES MUST BE CONDUCTED BY A TRAINED CERTIFIED BACKFLOW
<br />TECHNICIAN.
<br />6. OIT IS RECOMMENDED THAT ALL IRRIGATION MAINTENANCE AND REPAIR BE PERFORMED BY CALIFORNIA LICENSED
<br />AND/OR CERTIFIED CONTRACTOR. NOT MAINTAINING IRRIGATION SYSTEMS IN AN EFFICIENT MANNER WILL RESULT IN PLANT
<br />AND LANDSCAPE DEGRADATION AND ADDITIONAL MAINTENANCE COSTS.
<br />7. IRRIGATION SYSTEM WINTERIZATION
<br />8. WHERE APPLICABLE, SHUT OFF AND DRAIN IRRIGATION SYSTEM(S) AT THE END OF THE IRRIGATION SEASON. TURN OFF ALL
<br />MAIN SUPPLY VALVES, OPEN ALL MANUAL DRAIN VALVES, AND BLEED VALVES ON BACKFLOW PREVENTION DEVICES. PERFORM
<br />WINTERIZATION PRIOR TO NOVEMBER 1ST.
<br />9. IRRIGATION START UP
<br />10. FLUSH ALL DRIP LINES AT FLUSH POINTS.
<br />11. REMOVE AND CLEAN ALL FILTERS AND REPLACE ANY DAMAGED FILTERS.
<br />12. CHECK THAT ALL WEATHERS SENSORS ARE FUNCTIONING AND REPLACE BATTERIES AS NEEDED.
|