Laserfiche WebLink
June 2025 <br />Feasibility Study: Project Alternative Evaluation Results <br />•All project alternatives meet groundwater sustainability criteria. Alternatives 1 <br />and 3 do not meet minimum 7,000 AFY drought year target. <br />•AFY estimates assume 18-hour daily operation (75% reliability) and are planning- <br />level values subject to confirmation during production well drilling and testing. <br />•Basis of Design Report (BODR) prepared by Carollo Engineers to establish the <br />conceptual and planning-level design framework for the recommended project <br />alternative <br />June 2025 <br />Tennis and Hansen Park Well Project Overview <br />Key Elements <br />•Tennis Park Well <br />•Hansen Park Well <br />•New pipeline (3,970 LF) <br />•Improvements to <br />Hopyard Chloramination <br />Facility <br />Page 31 of 80