Laserfiche WebLink
5 <br />9 <br />Regional Project Feasibility Study Summary <br />10 <br />•Project is determined to be feasible <br />•Highest scoring alternative is two wells in Hansen and Tennis Community Parks <br />•The project is estimated to produce over 8,200 AFY in a drought <br />•The total project cost is estimated at $42.3 million (NOT including Pleasanton <br />required infrastructure costs) <br />Page 39 of 80