My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET 2-17-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
021726 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET 2-17-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2026 2:51:05 PM
Creation date
2/11/2026 10:12:36 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/17/2026
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 4 <br /> <br />As the City’s legislative body, the City Council is authorized to summarily vacate public <br />easements that are no longer necessary or relevant. The PSE granted by Instrument No. 76- <br />99334 qualifies for vacation because planned improvements will occupy the easement area, <br />and no public utility facilities currently exist within the easement. <br /> <br />Adoption of the Resolution of Summary Vacation for the public service easement (Attachment <br />4), together with the recordation of Tract Map 8631, effectuates the removal of the existing <br />PSE and the dedication of a replacement PSE. <br /> <br /> CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) <br /> City Council Resolution No. 2025-001 confirmed, under CEQA Guidelines Section 15183 <br />(Consistency Checklist), that no additional environmental review is required because the <br />development application is consistent with the General Plan and Zoning and will not have <br />site-specific impacts. <br /> <br />EQUITY AND SUSTAINABILITY <br />Not applicable, as this item is an administrative matter of City business. <br /> <br />OUTREACH <br />Approval of the development application involved public hearings before both the Planning <br />Commission and City Council. Condition of Approval 27 of Resolution No. 2025-001 requires <br />the subdivider to notify neighbors within 300 feet of the project site of the construction <br />schedule. <br /> <br />Notification letters were sent to easement beneficiaries, as required by California Streets and <br />Highways Code §8335(b)(5). No easement beneficiary submitted an objection to the proposed <br />PSE vacation. <br /> <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this action advances the ONE Pleasanton strategic goal of Building a Community <br />Where Everyone Belongs. <br /> <br />FISCAL IMPACT <br />The proposed project is anticipated to result in limited additional long-term operation, <br />maintenance, and replacement costs to the City compared to the existing condition. On-site <br />sanitary sewer and storm drainage facilities, as well as private roads and common areas, will <br />be privately owned and maintained by an HOA or other private entity and will not become a <br />City responsibility. <br /> <br />The project includes public water infrastructure that will be owned and maintained by the City. <br />Ongoing operation, maintenance, and future replacement costs associated with public water <br />facilities will be addressed through the City’s established water enterprise fund and <br />incorporated into future water rate analyses, consistent with standard City practice. No other <br />public infrastructure requiring City maintenance is proposed as part of the project. <br /> <br />This development is expected to generate the following approximate revenue from impact <br />fees: <br />Page 45 of 144
The URL can be used to link to this page
Your browser does not support the video tag.