Laserfiche WebLink
Harvest Church- CUP set <br />December, 2025Page - 14 <br />ICV <br />ICV <br />ICV <br />VLT <br />BF <br />P <br />BF <br />P <br />WTWT <br />WM <br />IC <br />V <br />EL VLT VLT VLT TE <br />L <br />TF <br />M <br />R <br />GM <br />CO <br />QUARRY LN. <br />Parking layout and circulation <br />PARKING ANALYSIS <br />198 proposed seats <br />1 space for each 6 seats* <br />33 Parking spaces required <br />54 Parking spaces provided on site <br />Existing trees <br />Proposed trees <br />Circulation <br />Suite A - No work <br />Suite B - (N) Layout <br />(N) Outdoor layout <br />(N) Landscape <br />PR <br />O <br />P <br />E <br />R <br />T <br />Y <br /> <br />L <br />I <br />N <br />E <br />PR <br />O <br />P <br />E <br />R <br />T <br />Y <br /> <br />L <br />I <br />N <br />E <br />PROPERTY LINE <br />*Pleasanton, Code of Ordinances, <br />18.88030D1 <br />*The new church will not overlap schedules <br />with the existing lab in Suite A.