Laserfiche WebLink
6th Cycle Program 1.7: 2. Kiewit Property: Either in conjunction with <br />preparation of a Specific Plan for East Pleasanton, or within a more <br />focused Master Plan or PUD plan for the 50-acre Kiewit area (Area 21), <br />work with the property owner to develop and adopt or approve a <br />conceptual plan, including housing at mixed densities, and a significant <br />affordable housing component. The planning will take into account <br />infrastructure, circulation, open space and amenities for residents, with <br />the goal of creating a sustainable new neighborhood in Pleasanton. New <br />public infrastructure (e.g., water, sewer, roadways etc.) will be necessary <br />throughout the East Pleasanton Specific Plan (EPSP) area, and cost <br />sharing of public infrastructure improvements is expected to occur <br />among EPSP developers, anticipating the use of community facilities <br />districts or similar financing structures. The plan will encourage a <br />diversity of housing types and seek to include innovative missing-middle <br />type and housing that can provide more compact units and some “entry- <br />level” market-rate homeownership and/or rental housing units that are <br />relatively affordable compared to larger units. Such affordable by design <br />approaches are intended to achieve more housing that is affordable to <br />first-time home buyers and other households that are unable to afford <br />most newly-constructed market-rate housing in Pleasanton but do not <br />qualify for below-market rate housing. <br />200 lower-income units approved or <br />constructed on large sites by January 2031 <br />Complete concept-level <br />planning (Framework) for the <br />Stoneridge Mall (March <br />2023). Complete and <br />adopt/approve detailed <br />Master Plans for Stoneridge <br />Mall site (July 2025) and <br />Kiewit property (July 2024). <br />Outreach to property owners <br />for other large sites: June <br />2023, and coordination to <br />offer technical support by <br />October 2024. If the City’s <br />efforts are not resulting in <br />progress toward housing <br />entitlement/development on <br />large sites by October 2026, <br />the City will review and revise <br />support efforts by May 2027. <br />The City’s action shall be <br />commensurate with the level <br />of progress toward housing <br />entitlement/development on <br />large sites (e.g., if no <br />progress has been made, a <br />rezoning action of additional <br />sites may be required). <br />6th Cycle <br />Completed Project approved on April 23, 2025. P23-0480 & <br />Vesting Tentative Map 8680, 3300 Busch Road – <br />Consideration of: 1) Approval for applications for <br />Housing Site Compliance Review (Design Review <br />Case No. P23-0480) and Vesting Tentative Map 8680 <br />approval pursuant to SB 330 for the construction of: a) <br />310 detached two-story single-family residential homes <br />with 62 junior accessory dwelling units (JADU); b) 102 <br />multiple-family rental units in five, three-story buildings <br />which include 101 affordable housing units and one <br />manager unit; c) a two-acre park owned/maintained by <br />the development’s Homeowners Association (HOA) <br />with access to the general public; and d) on- and off- <br />site improvements; 2) Adoption of CEQA Guidelines <br />Section 15183 Consistency Checklist pursuant to the <br />City of Pleasanton Housing Element Update Final <br />Environmental Impact Report (FEIR); and 3) <br />Recommendation to the City Council to enter into an <br />Affordable Housing Agreement for the proposed <br />project at 3300 Busch Road. <br />Units 101 affordable units https://pleasantonca.portal.civicclerk.com/ <br />event/466/files/agenda/992 <br />6th Cycle Program 1.7: 3. Other High Density Sites Larger than 10 Acres <br />(Hacienda Terrace, Metro 580, Signature Center3 , and Oracle): Conduct <br />outreach with the owners of these properties to discuss development <br />constraints and opportunities, and to provide technical and planning <br />support to facilitate development and opportunities. Such support may <br />include offering incentives such as modification of parking ratios / relief <br />from replacement parking requirements for commercial uses elsewhere <br />on the site; assistance with developing site planning concepts; and <br />advice/assistance on the steps to subdivide into appropriate sizes (e.g., 1 <br />to 10 acres) and re-zone the properties for the desired residential uses. <br />For those high density sites larger than 10 acres where the City has <br />illustrated subareas within these larger sites that reflect areas expected <br />to be redeveloped or infilled with housing (i.e., Metro 580, Oracle, <br />Hacienda Terrace, and Signature Center3), to improve the feasibility for <br />redevelopment with housing, the City shall allow (without a requirement <br />for legislative approval) flexibility in the precise location of the future <br />housing within the larger site, provided that minimum densities and <br />maximum unit counts remain within the ranges listed for each site in <br />Appendix B (exempting additional density allowable by density bonus <br />law). <br />200 lower-income units approved or <br />constructed on large sites by January 2031 <br />Complete concept-level <br />planning (Framework) for the <br />Stoneridge Mall (March <br />2023). Complete and <br />adopt/approve detailed <br />Master Plans for Stoneridge <br />Mall site (July 2025) and <br />Kiewit property (July 2024). <br />Outreach to property owners <br />for other large sites: June <br />2023, and coordination to <br />offer technical support by <br />October 2024. If the City’s <br />efforts are not resulting in <br />progress toward housing <br />entitlement/development on <br />large sites by October 2026, <br />the City will review and revise <br />support efforts by May 2027. <br />The City’s action shall be <br />commensurate with the level <br />of progress toward housing <br />entitlement/development on <br />large sites (e.g., if no <br />progress has been made, a <br />rezoning action of additional <br />sites may be required). <br />6th Cycle <br />Continuous Other large sites: City Council adopted conforming <br />zoning for each of the large sites in December, 2023, <br />consistent with the Housing Element; and has been in <br />contact with owners/representatives of the Signature <br />Center, Metro 580, and Hacienda Terrace sites in 2023 <br />to discuss potential development opportunities. <br />Units Rezoning: <br />https://pleasantonca.portal.civicclerk.com/ <br />event/85/files/report/108 <br />Page 26 of 242