My WebLink
|
Help
|
About
|
Sign Out
RUGGERI-JENSEN-AZAR - 3RD AMEND (#2022012)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
R
>
RUGGERI-JENSEN-AZAR - 3RD AMEND (#2022012)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2026 4:58:46 PM
Creation date
3/13/2026 4:55:54 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
Amendment
NAME
RUGGERI-JENSEN-AZAR (THIRD AMENDMENT)
Contract Record Series
704-05
Contract Expiration
6/30/2026
NOTES
CONSULTATANT PROVIDING GENERAL ENGINEERING SERVICES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />City of Pleasanton <br />On Call Services for General Civil Engineering Services <br />Wood Rodgers Rate Schedule <br />January 2021 through June 30,2024 <br />1/1/2021- 7/1/2021- 7/1/2022- 7/1/2023- <br />CLASSIFICATION 6/30/2021 6/30/2022 6/30/2023 6/30/2024 <br />Principal Engineer/Geologist/Surveyor/Planner/GIS/LA•II 255 265.20 275.81 286.84 <br />Principal Engineer/Geologist/Surveyor/Planner/GIS/LA•I 225 234.00 243.36 253.09 <br />Associate Engineer/Geologist/Surveyor/Planner/GIS/LA"Ill 215 223.60 232.54 5241.85 <br />Associate Engineer/Geologist/Surveyor/Planner/GIS/LA"II 205 213.20 221.73 230.60 <br />Associate Engineer/Geologist/Surveyor/Planner/GIS/LA•I 195 202.80 210.91 219.35 <br />Engineer/Geologist/Surveyor/Planner/G15/LA•Ill 180 187.20 194.69 202.48 <br />Engineer/Geologist/Surveyor/Planner/GIS/LA"II 170 176.80 183.87 191.23 <br />Engineer/Geologist/Surveyor/Planner/GIS/LA•I 160 166.40 173.06 179.98 <br />Assistant Engineer/Geologist/Surveyor/Planner/GIS/LA" 130 135.20 140.61 146.23 <br />CAD Technician III 160 166.40 173.06 179.98 <br />CAD Technician II 145 150.80 156.83 163.11 <br />CAD Technician I 130 135.20 140.61 146.23 <br />Project Coordinator 140 145.60 151.42 157.48 <br />Administrative Assistant 120 $124.80 129.79 134.98 <br />1 Person Survey Crew 215 223.60 232.54 241.85 <br />2 Person Survey Crew 315 327.60 340.70 354.33 <br />3 Person Survey Crew 405 421.20 438.05 455.57 <br />Consultants,Outside Services,Materials&Direct Charges Cost Plus 10% Cost Plus 10% Cost Plus 10% Cost Plus 10% <br />Overtime Work Rate Plus 50% Rate Plus 50% Rate Plus 50% Rate Plus 50% <br />LA=Landscape Architect <br />Blueprints,reproductions,and outside graphic services will be charged at vendor invoice. <br />Auto mileage will be charged at the IRS standard rate,currently 56.0 cents per mile. <br />Docusign Envelope ID: A9ABBCF8-233A-4F79-A452-372E661F5285
The URL can be used to link to this page
Your browser does not support the video tag.