My WebLink
|
Help
|
About
|
Sign Out
CAROLLO ENGINEERS, INC. 3RD AMENDMENT (#2022494)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
C
>
CAROLLO ENGINEERS, INC. 3RD AMENDMENT (#2022494)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2026 4:17:13 PM
Creation date
3/27/2026 3:32:39 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
Amendment
NAME
CAROLLO ENGINEEERS, INC. (3RD AMENDMENT)
Contract Record Series
704-05
Munis Contract #
2022494
Contract Expiration
12/31/2026
NOTES
WATER SYSTEM MANAGEMENT PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAGE 2 of 3 <br />2. Chlorine Residual Maintenance: Procedures for monitoring and maintaining target chlorine <br />residuals, adjusting operational setpoints, and responding to low-residual conditions to minimize <br />DBP formation while maintaining regulatory compliance. <br />Carollo will present draft SOP content during bi-weekly coordination meetings with City staff. One round of <br />City review and comment will be incorporated into the final SOPs. <br />Task 2 Deliverables <br /> Draft SOP documents <br /> Final SOP documents incorporating City comments <br />Task 3 Feasibility of Road, DBP Control, and Power Improvements (CAP/OER Action Items LT-1 <br />and LT-2) <br />Carollo will evaluate the feasibility of providing permanent access road improvements to Tank 1300, 1600 <br />and 1160; improving DBP control measures and/or converting to chloramination and providing nitrification <br />control measures; and improving/extending power to all three tank sites as required. The feasibility <br />assessment will be conducted in coordination with the City and relevant stakeholders, as appropriate, and <br />will address planning-level considerations necessary to inform future design and implementation. <br />The evaluation will include development of preliminary access road alignment concepts, an initial biological <br />constraints assessment, and an assessment of options for extending electrical power to the site. For DBP <br />controls the evaluation will consider continuous mixing, analyzers, and automated control systems. For <br />conversion to chloramination, the evaluation will consider RCS technology (on-site generation vs. bulk <br />chemicals), chemical delivery constraints, and nitrification control measures. <br />Planning-level capital cost estimates will be prepared for recommended alternatives. The assessment will <br />identify any fatal flaws that could preclude implementation, as well as key biological and environmental <br />factors that may affect construction scheduling and permitting requirements. Potential mitigation measures <br />to address identified constraints will also be summarized. <br />This task also includes a site visit that will include the road, power, and biological teams. <br />Task 3 Deliverables <br /> Draft Feasibility Assessment Technical Memorandum <br /> Final Feasibility Assessment Technical Memorandum incorporating City comments <br />Task 4 Hydraulic Modifications Evaluation (CAP/OER Action Items ST-1D and ST-2B) <br />Carollo will coordinate with the City’s water system hydraulic modeling consultant to evaluate water age <br />under alternative operations and identify strategies that support more frequent cycling and lower residence <br />times. Carollo will also coordinate with the City’s water system hydraulic modeling consultant to evaluate <br />increasing flow from Turnouts 1 and 4 relative to Turnout 5, potentially increasing groundwater fraction <br />from Zone 7 if needed based on their operation to the Kilkare pressure zones. The evaluation will consider <br />multiple operational scenarios, including alternative source routing and system operations strategies, to <br />assess feasibility and potential impacts on system performance. Planning level cost estimates will be <br />provided for any strategies requiring new or modification to existing infrastructure. <br />Carollo will summarize preliminary findings during bi-weekly coordination meetings with City staff. A <br />technical memorandum documenting the evaluation methodology, assumptions, scenarios analyzed, and <br />key findings will be prepared for City review. Summary conclusions and recommendations from this <br />evaluation will also be incorporated into the DDW Progress Report prepared under Task 5. <br />Docusign Envelope ID: 271FE856-C5AE-4E67-BBDD-ED81F3311151
The URL can be used to link to this page
Your browser does not support the video tag.