My WebLink
|
Help
|
About
|
Sign Out
GREEK ORTHODOX CHURCH OF THE RESURRECTION
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
G
>
GREEK ORTHODOX CHURCH OF THE RESURRECTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2026 2:34:48 PM
Creation date
4/7/2026 2:21:54 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
3/9/2026
LONG TERM AGREEMENTS - NAME
GREEK ORTHODOX CHURCH OF RESURRECTION 2ND AMEND)
LONG TERM AGREEMENTS - TYPE
SUBDIVISION AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
PARCEL MAP 10539
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A (page 9 of 9) <br /> PRELIMINARY ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COSTS <br /> Resurrection Greek Orthodox Church Site December 14,2021 <br /> 11300 Dublin Canyon Road Job No. 191085 <br /> PLEASANTON,CALIFORNIA Page 1 of 1 <br /> (For Bonding Purposes) <br /> ITEM DESCRIPTION QUANTITY UNIT PRICE AMOUNT <br /> I. OFF-SITE IMPROVEMENTS <br /> 1. Mobilization 1 LS $10,000.00 $10,000 <br /> 2. Remove Existing Trees 12 EA $500.00 $6,000 <br /> 3. Sawcut and Pavement Removal 1,700 SF $3.00 $5,100 <br /> 4. Fine Grading 21,000 SF $1.00 $21,000 <br /> 5. 6"Curb and Gutter with Subdrain 820 LF $30.00 $24,600 <br /> 6. Concrete Valley Gutter 52 LF $50.00 $2,600 <br /> 7. Curb Ramp 2 EA $3,500.00 $7,000 <br /> 8. Concrete Walkway 4,900 SF $10.00 $49,000 <br /> 9. AC Pavement(4"AC/11"AB) 9,000 SF $8.00 $72,000 <br /> 10. AC Pavement Overlay(1 1/2") 850 SF $3.00 $2,550 <br /> 11. Erosion Control 1 LS $3,500.00 $3,500 <br /> 12. Signing and Striping 1 LS $10,000.00 $10,000 <br /> 13. Underground Existing Overhead Electric 900 LF $300.00 $270,000 <br /> 14. Street Lights(including conduits,wires&pull boxes) 2 EA $6,000.00 $12,000 <br /> 15. Engineering Design Services(Off-site Improvements) 1 LS $36,500.00 $36,500 <br /> 16. Stormwater Control Plan preparation 1 LS $14,500.00 $14,500 <br /> 17. SWPPP Preparation 1 LS $3,000.00 $3,000 <br /> SUBTOTAL= $549,350 <br /> 20%CONSTRUCTION CONTINGENCY = $109,870 <br /> TOTAL ESTIMATED CONSTRUCTION COST= $659,220 <br /> Notes: <br /> 1. All cost figures are given as estimates only. Actual cost will be dependent on the cost figures at bidding time;the general <br /> market situation,contractor's work load,seasonal factor,labor and cost,etc. This engineering firm cannot be responsible for <br /> fluctuations in cost factors. <br /> 2. This engineer's opinion does not include any agency fees. <br /> 3. This engineer's opinion is based on Planned Unit Development-Resurrection Greek Orthodox Church prepared by Ruggeri- <br /> Jensen-Azar,dated May 28,2021. <br /> 4. This engineer's opinion does not include landscape improvements. <br /> 5. This engineer's opinion is for public improvements within the public right of way only. <br /> G:yob201911910850ominMEstimates1191085•Bonding Cost Esbmetaxlss <br />
The URL can be used to link to this page
Your browser does not support the video tag.