Laserfiche WebLink
<br />Wireless Telecommunications Facilities Policy (City of Pleasanton) page 19 / 37 <br />notification and suppression systems for all wireless facilities as approved by <br />the applicable Fire Safety Authority. <br /> <br />(13) Secondary Power Sources. The approval authority may approve secondary <br />or backup power sources and/or generators on a case-by-case basis. No <br />permanent diesel generators or other similarly noisy or noxious generators in <br />or within 250 feet from any residence are permitted absent a showing of <br />extraordinary need; provided, however, the approval authority may approve <br />sockets or other connections used for temporary backup generators. <br /> <br />(14) Parking; Access. Any equipment or improvements constructed or installed in <br />connection with any wireless facilities must not reduce any parking spaces <br />below the minimum requirement for the subject property. Whenever feasible, <br />existing parking and access should be used for ingress and egress from new <br />wireless facilities rather than constructing new parking or access improvements <br />to access the wireless facility. Any new parking or access improvements should <br />be the minimum size necessary to reasonably accommodate the proposed use <br />and comply with applicable safety codes. <br /> <br />(15) Utilities. All cables and connectors for telephone, primary electric and other <br />similar utilities must be routed underground to the extent feasible in conduits <br />large enough to accommodate future collocated wireless facilities. To the <br />extent feasible, undergrounded cables and wires must transition directly into <br />the pole base without any external doghouse or similar enclosure. Meters, <br />panels, disconnect switches and other associated improvements must be <br />placed in inconspicuous locations to the extent possible. No new overhead <br />utility lines or service drops are permitted merely because compliance with the <br />undergrounding requirements would increase the project cost. Microwave or <br />other wireless backhaul is discouraged when it would involve a separate and <br />non-stealth antenna. <br /> <br />(16) Future Expansion. To the extent feasible and aesthetically desirable, all new <br />wireless facilities should be designed and sited in a manner that <br />accommodates potential future collocations and other expansions that can be <br />integrated into the proposed wireless facility or its associated structures with <br />no or negligible visual changes to the outward appearance. The approval <br />authority may waive this requirement when the approval authority determines <br />future expansions at a proposed wireless facility would be aest hetically <br />undesirable. <br /> <br />(17) Compliance with Laws. All wireless facilities must be designed and sited in <br />compliance with all applicable federal, state, regional, and local laws, <br />regulations, rules, restrictions and conditions, which includes without limitation <br />the California Building Standards Code, Americans with Disabilities Act, the <br />general plan and any applicable specific plan, the Municipal Code and any <br />Docusign Envelope ID: 51CE5BDE-55F1-4B3D-8865-17E5814CF0C5