Laserfiche WebLink
<br />Eligible Facilities Requests Policy (City of Pleasanton) page 8 / 26 <br />(A) the proposed collocation or modification increases the overall height more <br />than 10% or 10 feet (whichever is greater); or <br /> <br />(B) the proposed collocation or modification increases the width more than 6 <br />feet from the edge of the wireless tower or base station; or <br /> <br />(C) the proposed collocation or modification involves the installation of any new <br />equipment cabinets on the ground when there are no existing ground - <br />mounted equipment cabinets; or <br /> <br />(D) the proposed collocation or modification involves the installation of any new <br />ground-mounted equipment cabinets that are ten percent (10%) larger in <br />height or volume than any existing ground-mounted equipment cabinets; or <br /> <br />(E) the proposed collocation or modification involves excavation or deployment <br />outside the area in proximity to the structure and other transmission <br />equipment already deployed on the ground. <br /> <br />(3) In addition, for all towers and base stations wherever located, a substantial <br />change occurs when: <br /> <br />(A) the proposed collocation or modification would defeat the existing <br />concealment elements of the support structure as determined by the <br />Director; or <br /> <br />(B) the proposed collocation or modification violates a prior condition of <br />approval, provided however that the collocation need not comply with any <br />prior condition of approval related to height, width, equipment cabinets or <br />excavation that is inconsistent with the thresholds for a su bstantial change <br />described in this section. <br /> <br />Note: The thresholds for a substantial change outlined above are disjunctive. The <br />failure to meet any one or more of the applicable thresholds means that a <br />substantial change would occur. The thresholds for height increases are <br />cumulative limits. For sites with horizontally separated deployments, the <br />cumulative limit is measured from the originally-permitted support structure without <br />regard to any increases in size due to wireless equipment not included in the <br />original design. For sites with vertically separated deployments, the cumulative <br />limit is measured from the permitted site dimensions as they existed on February <br />22, 2012—the date that Congress passed Section 6409(a). <br /> <br />(z) “tower” means the same as defined by the FCC in 47 C.F.R. § 1.6100(b)(9), which <br />defines that term as “[a]ny structure built for the sole or primary purpose of <br />supporting any FCC-licensed or authorized antennas and their associated <br />facilities, including structures that are constructed for wireless communications <br />services including, but not limited to, private, broadcast, and public safety services, <br />Docusign Envelope ID: 51CE5BDE-55F1-4B3D-8865-17E5814CF0C5