<br />Eligible Facilities Requests Policy (City of Pleasanton) page 16 / 26 <br /> <br />(5) CPUC GO-159A Certification. Within 15 business days after the City’s grant <br />of this EFR Approval or any EFR Approval is deemed granted or deemed <br />approved by the operation of law, the permittee shall serve copies of California <br />Public Utility Commission notification letters required by CPUC General Order <br />No. 159A to the City Clerk, Director and City Manager. <br /> <br />(6) Build-Out Period. This EFR Approval will automatically expire 12 months from <br />the approval date or deemed granted or deemed approved date (the “Build- <br />Out Period”) unless the permittee obtains all other permits and approvals <br />required to install, construct and/or operate the approved wireless facility, which <br />includes without limitation any permits or approvals required by any federal, <br />state or local public agencies with jurisdiction over the subject property, support <br />structure or the wireless facility and/or its use. The permittee may request in <br />writing, and the Director may grant in writing, one 12-month extension to the <br />Build-Out Period if the permittee submits, at least 30 days prior to the automatic <br />expiration date in this condition, substantial and reliable written evidence <br />demonstrating justifiable cause for the 12-month extension submitted. If the <br />Build-Out Period (and any extension) finally expires, this EFR Approval shall <br />be automatically void but the permittee may resubmit a complete application, <br />which includes without limitation all application fees, for the same or a <br />substantially similar project. <br /> <br />(7) Pre-Installation Requirements. In addition to obtaining all other permits and <br />approvals required to install, construct and/or operate the approved wireless <br />facility, which includes without limitation any permits or approvals required by <br />any federal, state or local public agencies with jurisdiction over the subject <br />property, the wireless facility or its use, the permittee shall, prior to <br />commencement of any installation or construction, attend a pre-grading <br />meeting with the Public Works Department regarding temporary Best <br />Management Practices (“BMPs”) pertaining to discharges from the <br />construction site. Before the permittee can proceed with installation or <br />construction of the approved wireless facility, the Public Works Department <br />must inspect and approve the permittee’s installation of such temporary BMPs. <br /> <br />(8) Post-Installation Certification. Within 60 calendar days after the permittee <br />commences full, unattended operations at the wireless facility, the permittee <br />shall provide the Director with documentation reasonably acceptable to the <br />Director that the wireless facility has been installed and/or constructed in strict <br />compliance with the Approved Plans. Such documentation shall include, <br />without limitation, electronic as-built drawings prepared by a California licensed <br />civil engineer, GIS data and site photographs. In a written notice to the <br />permittee, the Director may (but shall not have the obligation to) either certify <br />that the wireless facility complies with the Approved Plans or order the <br />permittee to correct any noncompliance. <br /> <br />Docusign Envelope ID: 51CE5BDE-55F1-4B3D-8865-17E5814CF0C5