Laserfiche WebLink
<br /> <br />Small Wireless Facilities Policy (City of Pleasanton) page 12 / 47 <br />due (e.g., Small Cell Permit application fees required for each small wireless facility <br />in the batch, and subsequent encroachment permit applications fees required for <br />each small wireless facility in the batch). If no permit application fee, application <br />review deposit, or combination application fee and review deposit has been <br />adopted at the time of application, then the applicant must submit a signed written <br />statement that acknowledges that the applicant will be required to submit a deposit <br />estimated by the Director to reimburse the City for its reasonable costs incurred in <br />connection with the application within 10 business days after the City issues a <br />written demand for reimbursement. Additional deposits shall be required if the <br />deposit is inadequate and must be replenished. If the deposit exceeds the actual <br />costs, the difference will be returned to the applicant following final inspection in <br />event of an approval, withdrawal of the application, or the conclusion of any <br />appeals or expiration of any appeal periods, whichever occurs later, in event of a <br />denial. <br /> <br />(c) Application Content. All applications for a permit must include all the information <br />and materials required by the Director for the application. The Director is <br />authorized to develop, publish and from time-to-time update or amend permit <br />application requirements, forms, checklists, guidelines, informational handouts <br />and other related materials that the Director finds necessary, appropriate or useful <br />for processing any application governed under this policy. All such requirements <br />must be in written form and publicly stated and available. All applications shall, at <br />a minimum, require the applicant to demonstrate that the proposed project will be <br />in planned compliance with all applicable health and safety laws, regulations or <br />other rules, which include without limitation all building codes, e lectric codes and <br />all FCC rules for human exposure to RF emissions. <br /> <br />(d) Batched Applications. Pursuant and subject to California Government Code § <br />65964.3, an applicant may submit up to 50 substantially similar wireless broadband <br />projects under a single application for a Small Cell Permit. Notwithstanding the <br />foregoing: (1) all substantially similar wireless broadband projects or small wireless <br />facilities in a batch must be proposed with substantially the same equipment in the <br />same configuration and on the same support structure type; (2) each substantially <br />similar wireless broadband project or small wireless facility in a batch must meet <br />all the requirements for a complete application, which includes without limitation <br />the applicable batched application fees pursuant to Section 7(b); (3) if the <br />application materials for any substantially similar wireless broadband project or <br />small wireless facility in a batch is deemed incomplete, the entire match shall be <br />automatically deemed incomplete; (4) if the application for a batch is deemed <br />withdrawn, such deemed withdrawn status shall apply to all substantially similar <br />wireless broadband projects or small wireless facilities in the batched application; <br />(5) if any substantially similar wireless broadband project or small wireless facility <br />in a batch fails to meet the required findings for approval, the entire batch shall be <br />denied; (6) any conditions of approval associated with the Small Cell Permit, <br />including but not limited to those provided in Section 14, shall be applied <br />individually to each wireless broadband project or small wireless facility in the <br />Docusign Envelope ID: 51CE5BDE-55F1-4B3D-8865-17E5814CF0C5