REGIONAL GROUNDWATER FACILITIES PROJECT <br />FEASIBILITY STUDY <br /> <br /> 20 Zone 7 Water Agency <br />December, 2025 <br /> <br />a Point estimates (dots) represent construction costs plus 30% soft costs, which include engineering, permitting, administration, <br />and contingency. <br />b Error bars represent the AACE Class 5 accuracy range (−30% to +50%) applied to construcƟon costs only. <br />c Costs are presented in 2025 dollars. <br />d Refined capital cost estimates for Project Alternative 2 are provided with the BODR in Appendix J and will be further refined as <br />the project advances to Phase II design if agreement is reached between Zone 7 and the City. <br />d Costs for Alternatives 1 and 3 are presented for informational purposes only, as these alternatives cannot meet Zone 7’s <br />drought year production target under the agency’s maximum allowable 75% runtime and have accordingly been eliminated <br />from consideration. <br /> <br />As shown in Figure 8, capital costs generally scale with the number of wells, ranging from approximately <br />$16.5 million for Alternative 1 (one well) to about $51.0 million for Alternative 4 (three wells). Alternatives <br />2 and 3, each involving two wells, fall in the $33 million range. The error bars reflect the Class 5 cost <br />uncertainty. <br />3.4.2. Annual Costs <br />Annual O&M costs were estimated for each alternative based on a target production of 7,000 AFY, or the <br />maximum annual production that the alternative is able to produce during drought years as shown in <br />Table 4. Major categories include staffing, power, chemicals, well rehabilitation, pump repair and/or <br />replacement, and electrical/instrumentation maintenance. Detailed assumptions are presented in <br />Appendix I. As previously discussed in this Study, although Alternatives 1 and 3 are not capable of <br />producing 7,000 AFY during drought years, the evaluation for these alternatives have been carried forward <br />for informational and comparison purposes. <br />In addition to direct O&M costs, capital costs were annualized using an Equivalent Uniform Annual Cost <br />(EUAC) approach in which one-time project capital cost are converted into an equivalent stream of <br />constant annual payments over the assumed facility life, enabling direct comparison with annual O&M <br />costs. The calculation applies a Capital Recovery Factor (CRF), which is based on a 50-year project life and <br />a 3 percent discount rate. The resulting annualized capital recovery values are then combined with O&M <br />to develop total annual project costs on a $/AF basis. <br />Figure 9. Project Alternative $/AF Annual Cost Estimates <br /> <br />$403 $418 $416 $440 <br />$559 <br />$607 $643 <br />$724 <br />$0 <br />$100 <br />$200 <br />$300 <br />$400 <br />$500 <br />$600 <br />$700 <br />$800 <br />An <br />n <br />u <br />a <br />l <br /> <br />O <br />& <br />M <br /> <br />C <br />o <br />s <br />t <br /> <br />E <br />s <br />t <br />i <br />m <br />a <br />t <br />e <br />s <br />($ <br />/ <br />A <br />F <br />) <br />Alternative 1 <br />(Tennis Park <br />Well) <br />Alternative 2 <br />(Tennis and <br />Hansen Park <br />Wells) <br />Alternative 3 <br />(Tennis and <br />Del Prado <br />Park Wells) <br />Alternative 4 <br />(Tennis, Hansen, <br />and Del Prado Park <br />Wells)