My WebLink
|
Help
|
About
|
Sign Out
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
042126 REGULAR
>
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 10:07:54 AM
Creation date
4/14/2026 9:55:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> I <br /> <br />TABLE OF CONTENTS <br />1. Introduction .............................................................................................................................................. 1 <br />2. Site Specific Investigation ......................................................................................................................... 1 <br />2.1. Test Hole Drilling and Well Construction .......................................................................................... 1 <br />2.2. Well Development and Testing ......................................................................................................... 3 <br />2.3. Water Quality .................................................................................................................................... 4 <br />2.4. Zone Sampling ................................................................................................................................... 4 <br />2.5. Flow Survey ........................................................................................................................................ 5 <br />2.6. Well Yield Estimation ......................................................................................................................... 6 <br />3. Production Well Design Recommendations ............................................................................................. 7 <br /> <br />LIST OF TABLES <br />Table 1. Tennis Park Test Well Construction Information ............................................................................ 2 <br />Table 2. Step Testing Results ........................................................................................................................ 3 <br />Table 3. Long-Term Constant Rate Test Results ........................................................................................... 4 <br />Table 4. Water Quality Targets and Exceedances ......................................................................................... 4 <br />Table 5. Zone Sampling Information ............................................................................................................. 5 <br />Table 6. Zonal Flow Contribution Pumping Conditions ................................................................................ 5 <br />Table 7. Zonal Flow Contribution Static Conditions ...................................................................................... 6 <br />Table 8. Summary of Well Pumping Capacity Estimates .............................................................................. 6 <br /> <br />LIST OF FIGURES <br />Figure 1. Well Location Map <br />Figure 2. Tennis Park Site Map <br />Figure 3. Test Well As-Built Profile <br />Figure 4. Step Test Hydrograph <br />Figure 5. Constant Rate Test Hydrograph <br />Figure 6. Proposed Production Well Design <br />Figure 7. Sieve Analysis <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.