Zone 7 Water Agency – Tennis Park Test Well Summary <br />and Production Well Design Recommendations <br /> <br /> <br /> 1 Zone 7 Water Agency <br />December 2025 <br /> <br />1. INTRODUCTION <br />Luhdorff and Scalmanini, Consulting Engineers (LSCE) have prepared this summary report documenting <br />the hydrogeologic site investigation of the Pleasanton Tennis and Community Park (Tennis Park) and <br />the construction and testing of the Tennis Park test well. The Tennis Park investigation was one of three <br />site investigations conducted as part of the Regional Groundwater Facilities Project Feasibility Study, a <br />joint project between Zone 7 Water Agency and the City of Pleasanton. Investigations and test well <br />construction were also conducted at Del Prado Park and Hansen Park in the City of Pleasanton. The <br />investigation of the Tennis Park site included drilling of an exploratory borehole to a depth of 820 feet <br />below ground surface (bgs), construction of an eight-inch diameter test well completed to 770 feet bgs <br />with eight screen sections between 195 feet and 760 feet bgs, pump testing, flow profiling, and water <br />quality sampling and analysis. This report also includes production well design recommendations and <br />flow rate estimates. <br />2. SITE SPECIFIC INVESTIGATION <br />The primary purposes of the investigation of the Tennis Park site were to characterize subsurface <br />lithology, characterize zonal water quality and flow characteristics, and collect the information necessary <br />to design a sand-free and efficient well that could yield water in sufficient quantity and quality to meet <br />project objectives. <br />The Tennis Park test well site is located in the east area of the park along Valley Avenue in Pleasanton, CA <br />(Figures 1 and 2). <br />The Tennis Park test well was drilled and constructed by Nor Cal Pump and Well Drilling (Nor Cal) of Yuba <br />City, California (CA C-57 License #908591). A copy of the permit for the drilling of the test hole and test <br />well construction obtained from Zone 7 Water Agency is attached in Appendix A. A copy of the <br />encroachment permit issued by the City of Pleasanton to work in the park is also included in Appendix A. <br />Pump test development and pump testing was performed by North State Electric and Pump (North State) <br />of Chico, California (CA C57 License #812678). A copy of the encroachment permit issued to North State <br />by the City of Pleasanton is attached in Appendix A. <br />Drilling commenced on February 5, 2025, and final well testing was completed on April 9, 2025. All work <br />was conducted per project specifications and permitting requirements including traffic control, sound <br />attenuation, and working hours unless variances were specifically granted by the City of Pleasanton. <br />2.1. Test Hole Drilling and Well Construction <br />Nor-Cal drilled the test hole from ground surface to 820 feet bgs at a diameter of 8.75 inches using the <br />direct rotary drilling method. Drill cuttings from the boring were collected at 10-foot intervals and <br />described by LSCE. Representative samples were collected in one-gallon resealable plastic bags and “chip <br />trays”. On February 7, 2025, after reaching the target depth, a suite of geophysical surveys were <br />conducted in the borehole (Appendix A) by Pacific Surveys of Claremont, California. Using the descriptions <br />of the drill cuttings and the geophysical surveys, LSCE developed a lithologic log of the materials