Zone 7 Water Agency – Tennis Park Test Well Summary <br />and Production Well Design Recommendations <br /> <br /> <br /> 3 Zone 7 Water Agency <br />December 2025 <br /> <br />February 10, 2025. Test well construction was completed on February 21, 2025. A copy of the Well <br />Completion Report is attached (Appendix A). <br />2.2. Well Development and Testing <br />Initial development of the well was performed by open-ended airlifting from the bottom of the casing <br />assembly, followed by swab/airlift development by Nor-Cal. Final developmental pumping was performed <br />with a submersible pump by North State. <br />Starting on February 25, 2025, the drill string was installed to the bottom of the casing, and the well was <br />airlifted open-ended. Between February 25 and March 7, 2025, a swab isolation tool was used to <br />swab/airlift each well screen. The screened sections were swabbed/airlifted from the top screen section <br />to the bottom screen section, and then from the bottom screen section to the top screen section over <br />multiple passes. All fluids generated during airlift operations were contained and disposed of offsite by <br />Nor-Cal. <br />After airlift operations were completed, LSCE collected water samples from the well for analysis of volatile <br />organic compounds (VOCs), fuel additives, semi-volatile organic compounds (VOC’s), polycyclic <br />aromatic hydrocarbons (PAH’s), and metals listed in NPDES Permit No. CAG912002. A summary table <br />of analytes and analysis results is included Appendix A. Only after the results of the water testing and <br />discharge plan (Appendix A) were accepted by the City of Pleasanton, was water discharged to the City’s <br />storm water system. Storm drain discharge monitoring field notes are included in Appendix A. <br />North State installed a temporary submersible pump in the well to perform pump and surge development <br />of the well and to conduct well testing. Between April 2, 2025, and April 4, 2025, the well was developed <br />at rates between 200 and 650 gallons per minute (gpm). <br />Step Test <br />Step testing was performed on April 8, 2025, and consisted of three (3) steps. The static water level in the <br />well measured prior to testing was 16.55 feet bgs. The discharge rate, pumping duration, projected <br />pumping water drawdown, and projected specific capacity of the test are included below in Table 2. The <br />step test hydrograph is depicted in Figure 4. <br />Table 2. Step Testing Results <br />Duration <br />(min) <br />Average Discharge Rate <br />(gpm) <br />Projected 24-Hour Drawdown <br />(ft) <br />Projected 24-Hour <br />Specific Capacity (gpm/ft) <br />120 329 21.1 72.3 <br />120 493 23.6 66.2 <br />240 613 27.8 53.5 <br /> <br />Long-Term Constant Rate Test <br />An 8-hour constant rate pumping test was performed on April 9, 2025, to determine well and aquifer <br />characteristics. The static water level measured prior to testing was 16.70 feet bgs. The discharge rate,