Laserfiche WebLink
Zone 7 Water Agency – Tennis Park Test Well Summary <br />and Production Well Design Recommendations <br /> <br /> <br /> 8 Zone 7 Water Agency <br />December 2025 <br /> <br />Gravel Envelope – Based on the sieve analysis of selected formation samples (Figure 7), a 6 x 9 graded <br />gravel envelope material was selected for use in this well. The gravel chosen is 4.9 times larger than the <br />finest formation sample (555-560 feet bgs) at the d70 (cumulative percent retained) value. The 0.080-inch <br />screen slot size will retain over 90 percent of the gravel material. The gravel envelope will be placed from <br />172 to 780 feet bgs. A two-foot, fine sand transition seal will be placed from 170 to 172 feet bgs. <br />Annular Seal – The deep annular seal will ensure that only groundwater from the targeted intervals will <br />enter the well structure. The annular seal shall consist of “10.3-sack” sand/cement grout and shall be <br />placed from a depth of 170 feet bgs to the ground surface. <br />Based on recent projects of similar size and scope, LSCE’s preliminary Engineer’s Estimate for the well <br />construction, development, and testing is approximately $2,000,000. Items such as water supply for <br />drilling, fluid and cutting disposal, development water disposal, material and equipment storage, sound <br />attenuation, working hours, and site security and safety that may affect the cost of well installation and <br />testing will need to be addressed in the final specifications before bidding. <br />Alternate Well Design Considerations <br />Well design recommendations were based on direction to maximize well yield. The recommended well <br />design includes screens placed opposite each zone identified in the test well borehole below a depth of <br />195 feet. Development of well capacity estimates assumed that each zone screened in the test well would <br />be targeted for completion in a production well. <br />The projected yield of the proposed Tennis Park Well constructed as recommended above is between <br />5,100 and 3,400 gpm, depending on long term and seasonal water level variations and a conservative well <br />efficiency value as discussed in the Pumping Capacity TM (Appendix C). Based on dynamic flow testing <br />conducted in the test well, the bottom three zones (560 - 760 feet) in the recommended well design will <br />contribute 11% of the total well yield or between 561 and 374 gpm of the projected yield of the production <br />well. In contrast, the upper four zones in the production well would contribute 89% of the well yield, or <br />4,539 to 3,026 gpm. <br />The estimated cost to drill, construct, and test the production well as recommended above is $2,000,000, <br />which equates to $2,545 per foot for the 780 foot well. The estimated cost to construct a 540 foot well <br />that does not screen the zones between 560 and 760 feet is $1,384,560, or 31% less than a 780 foot well. <br />Put another way, an 11% reduction in yield will result in a 31% cost savings for the construction of the <br />production well.