My WebLink
|
Help
|
About
|
Sign Out
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
042126 REGULAR
>
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 10:07:54 AM
Creation date
4/14/2026 9:55:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Constant Rate Test - Tennis Park Test Well <br />Test Wells and Design Construction Summary Report <br />Zone 7 Pleasanton, CA <br />Figure <br />10 <br />15 <br />20 <br />25 <br />30 <br />35 <br />40 <br />45 <br />50 <br />55 <br />60 <br />1 10 100 1,000 10,000 <br />De <br />p <br />t <br />h <br /> <br />t <br />o <br /> <br />W <br />a <br />t <br />e <br />r <br /> <br />( <br />f <br />e <br />e <br />t <br /> <br />b <br />g <br />s <br /> <br />M <br />P <br />) <br />Elapsed Time (minutes) <br />24 Hours <br />April 9, 2025 <br />SWL = 16.70 feet bgs <br />Avg Q = 549 gpm <br />Projected 24-Hour Q/s = 56.0
The URL can be used to link to this page
Your browser does not support the video tag.