Laserfiche WebLink
EVALUATION OF GROUNDWATER SUPPLY ALTERNATIVES WITHIN BERNAL SUBBASIN <br />APRIL 2026 / FINAL / CAROLLO <br />CITY OF PLEASANTON 12 <br /> <br />Source: Background water system map presented in Groundwater Supply Alternatives Hydraulic Analysis Results Package No.1 <br />Revised (November 2025) by Akel Engineering Group, Inc. <br />Figure 7 Alternative 3 – Overview of City Distribution Improvements <br />4.2 Infrastructure Improvements <br />This alternative requires two new groundwater wells, chloramination and fluoridation facilities, and City <br />distribution system improvements to produce, convey, and distribute the City’s GPQ. These infrastructure <br />improvements are described in the following section. <br />4.2.1 City Distribution System Improvements <br />Table 5 summarizes the required improvements to the City’s distribution system under Alternative 3. <br />These projects were identified in Akel’s Hydraulic Analysis Results Package No. 1 (Revised) (Akel, 2025).