My WebLink
|
Help
|
About
|
Sign Out
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
042126 REGULAR
>
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 10:07:54 AM
Creation date
4/14/2026 9:55:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVALUATION OF GROUNDWATER SUPPLY ALTERNATIVES WITHIN BERNAL SUBBASIN <br />APRIL 2026 / FINAL / CAROLLO <br />CITY OF PLEASANTON 12 <br /> <br />Source: Background water system map presented in Groundwater Supply Alternatives Hydraulic Analysis Results Package No.1 <br />Revised (November 2025) by Akel Engineering Group, Inc. <br />Figure 7 Alternative 3 – Overview of City Distribution Improvements <br />4.2 Infrastructure Improvements <br />This alternative requires two new groundwater wells, chloramination and fluoridation facilities, and City <br />distribution system improvements to produce, convey, and distribute the City’s GPQ. These infrastructure <br />improvements are described in the following section. <br />4.2.1 City Distribution System Improvements <br />Table 5 summarizes the required improvements to the City’s distribution system under Alternative 3. <br />These projects were identified in Akel’s Hydraulic Analysis Results Package No. 1 (Revised) (Akel, 2025).
The URL can be used to link to this page
Your browser does not support the video tag.