My WebLink
|
Help
|
About
|
Sign Out
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
042126 REGULAR
>
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 10:07:54 AM
Creation date
4/14/2026 9:55:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
500 First Street, Woodland, CA 95695 • Tel. 530.661.0109 • Fax. 530.661.6806 • lsce.com <br />Well Capacity Estimates for Zone 7/Pleasanton Test Well Sites <br />An 8-inch diameter test well was constructed at Del Prado Park, Tennis Park, and Hansen Park. Each well <br />was developed, had step-drawdown pumping tests conducted, and had constant rate pumping tests <br />conducted for 8 hours. The data derived from the constant rate pumping tests, combined with data <br />regarding the range of expected regional groundwater levels, were reviewed for the development of full- <br />scale production well pumping capacity estimates at each location. <br />It should be noted that while well capacity estimates described below are based on some very specific <br />input values (e.g., for specific capacity, assumed static groundwater levels), the final production capacity <br />for each well cannot be precisely known until the large-diameter production wells are drilled and tested. <br />This is due in large part to considerable uncertainty in the well efficiency input parameter, which is as <br />much a function of the well efficiency and quality of work done by the drilling subcontractor as it is a <br />function of the engineering oversight and design specifications (e.g., filter pack gradation, screen slot size). <br />Thus, while the well capacity estimates described below may represent a best estimate at this time, they <br />could vary by several hundred gpm more or less than the values described below. <br />Background and Considerations in Low-End Well Capacity Estimates <br />The basis for the low-end production rate well capacity analysis is the occurrence of worst-case (critical <br />years with maximum municipal groundwater pumping) groundwater basin conditions. Groundwater <br />elevation contour maps were reviewed for recent critical drought years, including Fall 2015, Fall 2021, and <br />Fall 2022. In addition, total municipal well pumping and City of Pleasanton groundwater pumping were <br />reviewed for these three critical dry years, along with the last ten years overall (Table 1). Overall, the <br />lowest groundwater elevations occurred in the Fall of 2021 and Fall 2022, consistent with the highest rates <br />of total municipal groundwater pumping (over the past 10 years), ranging from 21,500 to 23,600 AFY, and <br />relatively high City of Pleasanton groundwater pumping between about 2,600 and 3,800 AFY.
The URL can be used to link to this page
Your browser does not support the video tag.