My WebLink
|
Help
|
About
|
Sign Out
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
042126 REGULAR
>
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 10:07:54 AM
Creation date
4/14/2026 9:55:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 <br />production wells. The difference between water levels inside a well casing and in the adjacent aquifer <br />formation refers to the well efficiency needed for well capacity estimates. For example, if the water level <br />in the wells declines by 100 feet during pumping but the aquifer groundwater level just outside the well <br />filter pack declines by 50 feet, the well efficiency is considered to be 50%. A reasonable well efficiency <br />target to strive for in most high-capacity production well drilling operations is 70 to 80%. For the purposes <br />of the well capacity estimates (based on 24-hour specific capacity) described below, it was assumed that <br />a production well at the Del Prado Park site could achieve a 75% well efficiency, while the production wells <br />at the Tennis Court and Hansen Park sites were conservatively estimated to have 50% well efficiency. <br />Lower well efficiencies were assumed at the higher specific capacity sites (Tennis and Hansen) primarily <br />because in highly permeable sediments,the flow of water at higher pumping rates has a greater tendency <br />to become turbulent, which increases friction losses and reduces well efficiencies. <br />ĞůWƌĂĚŽWĂƌŬtĞůůĂƉĂĐŝƚLJƐƚŝŵĂƚĞ <br />The upper end well capacity estimate for the Del Prado Park test well is summarized in Table 4. The <br />average pumping rate of 252 gpm combined with a projected 24-hour drawdown of 15.6 feet yields a <br />specific capacity of 16.2 gpm/ft. The April 2025 static water level of 17 feet below ground surface (bgs), <br />combined with depth to top of first screen of 170 feet bgs, yields an available drawdown of 153 feet. <br />Multiplying the specific capacity of 16.2 gpm/ft times the available drawdown of 153 feet yields an interim <br />well capacity calculation of about 2,500 gpm. Applying a well efficiency factor of 75% yields a final upper- <br />end well yield estimate of approximately 1,900 gpm. <br />The lower end well capacity estimate is based on the same specific capacity, top of upper well screen, and <br />well efficiency calculations/assumptions as summarized above. However, the April 2025 static water level <br />of 17 feet bgs was substituted with a drought year assumed depth to water of 65 feet bgs based on review <br />of groundwater elevation contour maps for 2021 and 2022, which yields an available drawdown of 105 <br />feet compared to 153 feet for the upper end well capacity calculation. Multiplying the specific capacity of <br />16.2 gpm/ft times the available drawdown of 105 feet yields an interim well capacity calculation of 1,700 <br />gpm. Applying a well efficiency factor of 75% yields a final lower-end well yield estimate of approximately <br />1,300 gpm (Table 4). <br />Tennis Park Well Capacity Estimate <br />The upper end well capacity estimate for the Tennis Park test well is summarized in Table 4. The average <br />pumping rate of 549 gpm combined with a projected 24-hour drawdown of 9.6 feet yields a specific <br />capacity of 57.2 gpm/ft. The April 2025 static water level of 17 feet below ground surface (bgs), combined <br />with depth to top of first screen of 195 feet bgs, yields an available drawdown of 178 feet. Multiplying the <br />specific capacity of 57.2 gpm/ft times the available drawdown of 178 feet yields an interim well capacity <br />calculation of 10,200 gpm. Applying a well efficiency factor of 50% yields a final upper-end well yield <br />estimate of approximately 5,100 gpm. <br />The lower end well capacity estimate is based on the same specific capacity, top of upper well screen, and <br />well efficiency calculations/assumptions as summarized above. However, the April 2025 static water level <br />of 17 feet bgs was substituted with a drought year assumed depth to water of 75 feet bgs based on review <br />of groundwater elevation contour maps for 2021 and 2022, which yields an available drawdown of 120 <br />feet compared to 178 feet for the upper end well capacity calculation. Multiplying the specific capacity of
The URL can be used to link to this page
Your browser does not support the video tag.