Page 4 <br />production wells. The difference between water levels inside a well casing and in the adjacent aquifer <br />formation refers to the well efficiency needed for well capacity estimates. For example, if the water level <br />in the wells declines by 100 feet during pumping but the aquifer groundwater level just outside the well <br />filter pack declines by 50 feet, the well efficiency is considered to be 50%. A reasonable well efficiency <br />target to strive for in most high-capacity production well drilling operations is 70 to 80%. For the purposes <br />of the well capacity estimates (based on 24-hour specific capacity) described below, it was assumed that <br />a production well at the Del Prado Park site could achieve a 75% well efficiency, while the production wells <br />at the Tennis Court and Hansen Park sites were conservatively estimated to have 50% well efficiency. <br />Lower well efficiencies were assumed at the higher specific capacity sites (Tennis and Hansen) primarily <br />because in highly permeable sediments,the flow of water at higher pumping rates has a greater tendency <br />to become turbulent, which increases friction losses and reduces well efficiencies. <br />ĞůWƌĂĚŽWĂƌŬtĞůůĂƉĂĐŝƚLJƐƚŝŵĂƚĞ <br />The upper end well capacity estimate for the Del Prado Park test well is summarized in Table 4. The <br />average pumping rate of 252 gpm combined with a projected 24-hour drawdown of 15.6 feet yields a <br />specific capacity of 16.2 gpm/ft. The April 2025 static water level of 17 feet below ground surface (bgs), <br />combined with depth to top of first screen of 170 feet bgs, yields an available drawdown of 153 feet. <br />Multiplying the specific capacity of 16.2 gpm/ft times the available drawdown of 153 feet yields an interim <br />well capacity calculation of about 2,500 gpm. Applying a well efficiency factor of 75% yields a final upper- <br />end well yield estimate of approximately 1,900 gpm. <br />The lower end well capacity estimate is based on the same specific capacity, top of upper well screen, and <br />well efficiency calculations/assumptions as summarized above. However, the April 2025 static water level <br />of 17 feet bgs was substituted with a drought year assumed depth to water of 65 feet bgs based on review <br />of groundwater elevation contour maps for 2021 and 2022, which yields an available drawdown of 105 <br />feet compared to 153 feet for the upper end well capacity calculation. Multiplying the specific capacity of <br />16.2 gpm/ft times the available drawdown of 105 feet yields an interim well capacity calculation of 1,700 <br />gpm. Applying a well efficiency factor of 75% yields a final lower-end well yield estimate of approximately <br />1,300 gpm (Table 4). <br />Tennis Park Well Capacity Estimate <br />The upper end well capacity estimate for the Tennis Park test well is summarized in Table 4. The average <br />pumping rate of 549 gpm combined with a projected 24-hour drawdown of 9.6 feet yields a specific <br />capacity of 57.2 gpm/ft. The April 2025 static water level of 17 feet below ground surface (bgs), combined <br />with depth to top of first screen of 195 feet bgs, yields an available drawdown of 178 feet. Multiplying the <br />specific capacity of 57.2 gpm/ft times the available drawdown of 178 feet yields an interim well capacity <br />calculation of 10,200 gpm. Applying a well efficiency factor of 50% yields a final upper-end well yield <br />estimate of approximately 5,100 gpm. <br />The lower end well capacity estimate is based on the same specific capacity, top of upper well screen, and <br />well efficiency calculations/assumptions as summarized above. However, the April 2025 static water level <br />of 17 feet bgs was substituted with a drought year assumed depth to water of 75 feet bgs based on review <br />of groundwater elevation contour maps for 2021 and 2022, which yields an available drawdown of 120 <br />feet compared to 178 feet for the upper end well capacity calculation. Multiplying the specific capacity of