My WebLink
|
Help
|
About
|
Sign Out
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
042126 REGULAR
>
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 10:07:54 AM
Creation date
4/14/2026 9:55:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 9 <br />ƐƐĞƐƐŵĞŶƚŽĨdĞƐƚtĞůů^ŝƚĞWƌŽĚƵĐƚŝŽŶtĞůůĂƉĂĐŝƚLJǁŝƚŚŽŶƐŝĚĞƌĂƚŝŽŶŽĨ <br />Mutual Well Interference and Longer-Term Specific Capacities <br />An extreme (and unlikely) scenario is that the mutual well interference drawdown calculations <br />summarized above would be additive to the groundwater elevations observed during the Fall of <br />2021/2022. It is not anticipated that all the existing wells would be operating at the same time as the new <br />test well sites. Assuming that the groundwater elevations observed in Fall 2021 and Fall 2022 reflect <br />operation of all the existing wells (as is generally indicated by review of historical annual municipal <br />groundwater pumping since 1974), the mutual well interference drawdowns calculated above would not <br />apply to the relatively low groundwater elevations observed in Fall 2021/2022. <br />However, in the case that Fall 2021 and Fall 2022 groundwater elevations are representative of the future <br />conditions without any new production wells at the test well sites operating, and that three new <br />production wells at the test well sites are operating as additional pumping capacity, the following analysis <br />may warrant consideration. Table 9 summarizes the assessment of how the original baseline minimum <br />well capacities may be impacted by the mutual well interference with all three test well sites pumping <br />simultaneously for 30 and 90 days continuously. The results are characterized both by reduced well <br />capacities that would result, and also by what the change would have to be in the well efficiency <br />assumptions to obtain the same original well pumping capacity estimates. The results for Tennis Park and <br />Hansen generally indicate a reduction in well capacities by approximately 10 percent or the need to <br />assume well efficiencies on the order of 55 to 60 percent instead of 50 percent. In the case of Del Prado <br />Park, either well capacities are reduced from 1,300 gpm to between 1,000 and 1,050 gpm, or well <br />efficiencies of 93 to 99 percent would need to be assumed. <br />Table 9 also shows the combination of long-term specific capacity assumptions (for 30 and 90 days) and <br />mutual well interference drawdowns (for three test well sites pumping). This maximum worst-case <br />scenario indicates Tennis Park and Hansen Park have well capacities reduced from 3,400 gpm to between <br />2,600 and 2,900 gpm, or the need to assume well efficiencies ranging from 59 to 66 percent. For Del Prado <br />Park, well capacities for this worst case drop from 1,300 gpm to between 880 and 975 gpm, or assumed <br />well efficiencies of 100 percent or greater (not possible). <br />Overall, this maximum worst-case scenario indicates that it is still reasonable to assume the original low- <br />end well capacities at Tennis Park and Hansen Park can be maintained, because achieving well efficiencies <br />up to 66 percent is reasonable. However, well efficiencies of 100 percent or greater are not reasonable to <br />assume for Del Prado Park, and it is likely that a reduced well capacity would occur under these worst- <br />case conditions. However, on additional consideration, it is noted that these low-end well capacity <br />estimates are based on Fall groundwater level conditions, whereas drought-year pumping will occur <br />throughout the year when water levels may be slightly higher. Therefore, even in the worst-casescenario, <br />the decline in well capacity may be limited to the Fall season.
The URL can be used to link to this page
Your browser does not support the video tag.