Laserfiche WebLink
Zone 7 Water Agency – Hansen Park Test Well Summary <br />and Production Well Design Recommendations <br />1 Zone 7 Water Agency <br />December 2025 <br />1.INTRODUCTION <br />Luhdorff and Scalmanini, Consulting Engineers (LSCE) have prepared this summary report documenting <br />the hydrogeologic site investigation of Hansen Park in the City of Pleasanton and the construction and <br />testing of the Hansen Park test well. The Hansen Park investigation was one of three site investigations <br />conducted as part of the Regional Groundwater Facilities Project Feasibility Study, a joint project <br />between Zone 7 Water Agency and the City of Pleasanton. Investigations and test well construction <br />were also conducted at Del Prado Park and Tennis Park in the City of Pleasanton. The investigation of <br />the Hansen Park site included drilling of an exploratory borehole to a depth of 770 feet below ground <br />surface (bgs), construction of an eight-inch diameter test well completed to 766 feet bgs with five <br />screen sections between 298 feet and 756 feet bgs, pump testing, flow profiling, and water quality <br />sampling and analysis. This report also includes well production design and flow rate recommendations. <br />2.SITE SPECIFIC INVESTIGATION <br />The primary purposes of the investigation of the Hansen Park site were to characterize subsurface <br />lithology, characterize zonal water quality and flow characteristics, and collect the information necessary <br />to design a sand-free and efficient well that could yield water in sufficient quantity and quality to meet <br />project objectives. <br />The Hansen Park site is located in the northwest corner of the park near the corner of Calle Ricardo and <br />Hasen Drive in Pleasanton, CA (Figures 1 and 2). <br />The Hansen Park test well was drilled and constructed by Nor Cal Pump and Well Drilling (Nor Cal) of Yuba <br />City, California (CA C-57 License #908591). A copy of the permit for the drilling of the test hole and test <br />well construction obtained from Zone 7 Water Agency is attached in Appendix A. A copy of the <br />encroachment permit issued by the City of Pleasanton to work in the park is also included in Appendix A. <br />Pump test development and pump testing was performed by North State Electric and Pump (North State) <br />of Chico, California (CA C57 License #812678). A copy of the encroachment permit issued to North State <br />by the City of Pleasanton is attached in Appendix A. <br />Drilling commenced on March 18, 2025, and final well testing was completed on June 4, 2025. All work <br />was conducted per project specifications and permitting requirements including traffic control, sound <br />attenuation, and working hours unless variances were specifically granted by the City of Pleasanton. <br />2.1. Test Hole Drilling and Well Construction <br />Nor-Cal drilled the test hole from ground surface to 770 feet bgs at a diameter of 8.75 inches using the <br />direct rotary drilling method. Drill cuttings from the boring were collected at 10-foot intervals and <br />described by LSCE Staff. Representative samples were collected in one-gallon resealable plastic bags and <br />“chip trays”. A suite of geophysical surveys were conducted in the borehole (Appendix A) by Pacific <br />Surveys of Claremont, California on March 21, 2025. Using the descriptions of the drill cuttings and the <br />geophysical surveys, LSCE developed a lithologic log of the materials encountered in the test hole. The <br />lithology encountered in the test hole and the geophysical logs are detailed on the attached test well as-