Zone 7 Water Agency – Hansen Park Test Well Summary <br />and Production Well Design Recommendations <br />3 Zone 7 Water Agency <br />December 2025 <br />After receiving approval of the test well design by Zone 7, reaming of the test hole to a diameter of 14.75 <br />inches to a depth of 770 feet bgs began. During reaming operations, upper borehole stability and caving <br />of formation materials were encountered. Drilling tools were removed from the borehole to prevent the <br />drill stem and bit from being struck in the borehole. A caliper log was performed in the borehole which <br />indicated the borehole was filled with formation materials and that the likely source of that materials <br />were washouts above 100 feet bgs. In order to proceed with well construction, LSCE recommended to <br />Zone 7 that a conductor casing be installed to a depth of 100 feet bgs and cemented into place to stabilize <br />the upper formations. After receiving approval from Zone 7 for the installation of the conductor casing, <br />Hogg Drilling (CA C-57 License #829276), working as a subcontractor to Nor-Cal, advanced a 30-inch <br />diameter borehole to 100 feet bgs using the bucket auger drilling method. An 18-inch diameter conductor <br />casing was installed to 100 feet and cemented into place with cement grout. After letting the seal material <br />cure, Nor-Cal reamed the remaining pilot hole from 100 feet bgs to 770 feet bgs to a diameter of 14.75- <br />inches with no further issues. A copy of the Well Completion Report is attached in Appendix A. <br />2.2. Well Development and Testing <br />Initial development of the well was performed by open-ended airlifting from the bottom of the casing <br />assembly, followed by swab/airlift development by Nor-Cal. Final developmental pumping was performed <br />with a submersible test pump by North State. <br />Starting on April 28, 2025, the drill string was installed to the bottom of the casing, and the well was <br />airlifted open-ended. Between April 29 and May 5, 2025, a swab isolation tool was used to swab/airlift <br />each well screen. The screened sections were swabbed/airlifted from the top screen section to the bottom <br />screen section, and then from the bottom screen section to the top screen section over multiple passes. <br />All fluids generated during airlift operations were contained and disposed of offsite by Nor-Cal. <br />After airlift operations were completed, LSCE collected water samples from the well for analysis of volatile <br />organic compounds (VOCs), fuel additives, semi-volatile organic compounds (SVOC’s), polycyclic <br />aromatic hydrocarbons (PAHs), and metals listed in NPDES Permit No. CAG912002. A summary table <br />of analytes and analysis results is included Appendix A. Only after the results of the water testing and <br />discharge plan (Appendix A) were accepted by the City of Pleasanton, was water discharged to the City’s <br />storm water system. <br />North State installed a temporary submersible pump in the well on May 28, 2025, to perform pump and <br />surge development of the well and to conduct well testing. Between May 28, 2025, and May 30, 2025, <br />the well was developed at rates between 200 and 650 gallons per minute (gpm) <br />Step Test <br />Step testing was performed on June 2, 2025, and consisted of three (3) steps. The static water level in the <br />well measured prior to testing was 25.50 feet bgs. The discharge rate, pumping duration, projected <br />pumping water drawdown, and projected specific capacity of the test are included below in Table 2. The <br />step test hydrograph is depicted in Figure 4.