Zone 7 Water Agency – Hansen Park Test Well Summary <br />and Production Well Design Recommendations <br />9 Zone 7 Water Agency <br />December 2025 <br />Blank Well Casing – Stainless steel was selected for the blank casing. Stainless steel will provide superior <br />corrosion resistance and well longevity while meeting DDW standards for NSF 60 certification. The blank <br />well casing shall be 24-inch I.D. by 3/8-inch wall ASTM A-778 Type 304L stainless steel. <br />Well Screen – Stainless steel, louvered well screen was selected to maximize well open area and efficiency, <br />and for compatibility with the blank well casing. The 24-inch I.D. well screen will be constructed ASTM A- <br />778, Type 304L stainless steel with a slot size of 0.080-inch. At a design capacity of 4,200 gpm, the screen <br />will have a theoretical inlet velocity of 0.0346 feet/second. <br />Accessory Pipes - A 2-foot-long, stainless steel sounding port shall be installed on the well casing from <br />297 to 299 feet bgs. A 2-inch, Schedule 40, Type 304L stainless steel sounding tube shall be connected to <br />the sounding port and installed to a depth of 297 feet bgs. A 3-inch, Schedule 40, BSP gravel fill tube shall <br />be installed to a depth of 280 feet bgs. <br />Gravel Envelope – Based on the sieve analysis of selected formation samples (Figure 7), a 6 x 9 graded <br />gravel envelope material was selected for use in this well. The gravel chosen is 5.1 times larger than the <br />finest formation sample (515-520 feet bgs) at the d70 (cumulative percent retained) value. The 0.080-inch <br />screen slot size will retain over 90 percent of the gravel material. The gravel envelope will be placed from <br />262 to 775 feet bgs. A two-foot, fine sand transition seal will be placed from 260 to 262 feet bgs. <br />Annular Seal – The deep annular seal will ensure that only groundwater from the targeted intervals will <br />enter the well structure. The annular seal shall consist of “10.3-sack” sand/cement grout and shall be <br />placed from a depth of 260 feet bgs to the ground surface. <br />Based on recent projects of similar size and scope, LSCE’s preliminary Engineer’s Estimate for the well <br />construction, development, and testing is approximately $2,000,000. Items such as water supply for <br />drilling, fluid and cutting disposal, development water disposal, material and equipment storage, sound <br />attenuation, working hours and site security and safety that may affect the cost of well installation and <br />testing will need to be addressed in the final specifications before bidding. <br />Alternate Well Design Considerations <br />Well design recommendations were based on direction to maximize well yield. The recommended well <br />design includes screens placed opposite each zone identified in the test well borehole below a depth of <br />300 feet. Development of well capacity estimates assumed that each zone screened in the test well would <br />be targeted for completion in a production well. <br />The projected yield of the proposed Hansen Park Well constructed as recommended above is between <br />4,200 and 3,400 gpm, depending on long term and seasonal water level variations and a conservative well <br />efficiency value as discussed in the TM (attached). Based on dynamic flow testing conducted in the test <br />well, the bottom three zones (605 - 755 feet) in the well contribute 15% of the total well yield or between <br />647 and 524 gpm of the projected yield of the production well. In contrast, the upper two zones in the <br />production well would contribute 85% of the well yield, or 3,553 to 2,876 gpm. <br />The estimated cost to drill, construct, and test the production well as recommended above is $2,000,000, <br />which equates to $2,545 per foot for a 775 foot well. The estimated cost to construct a well that targets