My WebLink
|
Help
|
About
|
Sign Out
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
042126 REGULAR
>
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 10:07:54 AM
Creation date
4/14/2026 9:55:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPINNER LOG ANALYSIS <br />Company: Luhdorf & Scalmanini <br />Well: Zone 7 -Hansen Park Test Well <br />County: Alameda <br />(DOWN) VERTICAL FLOW 12.2 GPM <br />SCREEN PRODUCTION % OF FLOW <br />DEPTHS (GPM) (ZONES) <br />298 to 318 12.2 100% <br />458 to 578 0.0 0% <br />608 to 628 -0.5 -4% <br />656 to 676 -3.5 -29% <br />736 to 756 -8.2 -67% <br />GPM/FT STD DEV <br />(GPM) <br />0.6 1.6 <br />0.0 1.1 <br />0.0 1.8 <br />-0.2 1.6 <br />-0.4 3.0 <br />Pacific Surveys <br />geophysical we/I logging <br />4-Jun-2025 <br />Job No. 33556 <br />STD ERROR <br />(+/-GPM) <br />0.0 <br />0.1 <br />0.2 <br />0.1 <br />1.2
The URL can be used to link to this page
Your browser does not support the video tag.