My WebLink
|
Help
|
About
|
Sign Out
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
042126 REGULAR
>
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 10:07:54 AM
Creation date
4/14/2026 9:55:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORM DRAIN DISCHARGE MONITORING <br />Project Name: �es + \N e•1 I � , tw..,5 ; 'd:,,.""" <br />Project No.: '1--� - 2 -o::;J <br />Discharge Description: <br />Location (cross roads): <br />Within 300' of creek ?: <br />Discharge Type: <br />□Well Development <br />□Well Pump Test <br />□Water Sampling <br />D Other: <br />□yes ;¢no <br />Date: r;--)... 9 - '2--S <br />Contractor: I'/ a,r ,t-� "7 h-k.- <br />Beneficially Reused ?: <br />Time Start/Stop: <br />Flow Rate: <br />Discharge Volume: <br />If Any Reused, Volume: <br />□yes �o <br />{J: 00/,9: 3 0 <br />�o-:SDD 'jf W"\ <br />191 Ooo <br />&S / <br />Best Management Practices <br />Erosion & Sediment Control (Drain Inlet Protection) check all that apply: <br />□filter fabric □gravel bag barrier <br />□cleaning /debris removal (e.g. vac truck) <br />Discharge Event Duration <br />< 20 minutes <br />20-60 minutes <br />>60 minutes <br />Date Time pH <br />t;-2,CJ -1,,:, ei:15" -:/·, 5 I <br />11 <(j :4-i;' 1,4\ <br />11 I�: '?O '1. '2i ::+ <br />o sediment dam of gravel bags <br />□other, specify: <br />Timing <br />1 sample during first 10 min. <br />1st sample during first 10 min. <br />2nd sample during last 10 min. <br />1st sample during first 10 min. <br />2nd sample during next 50 min. <br />3rd sample during last 10 min. <br />Turbidity Comments <br />(NTU) <br />s;,-. l <br />40 / S° <br />:;i.-o ' 0 <br />Page_of _
The URL can be used to link to this page
Your browser does not support the video tag.