My WebLink
|
Help
|
About
|
Sign Out
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
042126 REGULAR
>
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 10:07:54 AM
Creation date
4/14/2026 9:55:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVALUATION OF GROUNDWATER SUPPLY ALTERNATIVES WITHIN BERNAL SUBBASIN <br />APRIL 2026 / FINAL / CAROLLO <br />CITY OF PLEASANTON 27 <br />Figure 12 shows the results of combining the relative benefit scores and total annual costs for each <br />project over a 50-year life cycle. Optimal results are in the top-left corner of the chart where the relative <br />benefit is highest and the total annual cost is lowest. Conversely, the bottom-right corner of the chart <br />represents suboptimal results where relative benefit is lowest and total annual is highest. <br /> <br />Figure 12 Relative Weighted Benefit Score of Project Alternatives <br />SECTION 6 SUMMARY <br />This study evaluates Alternative 1 (Baseline Project), Alternative 2 (Joint Project), and Alternative 3 (City <br />Only Project) based on the criteria defined herein, weighted scoring, and annualized capital and O&M <br />costs to identify the preferred alternative. This evaluation identified Alternative 2 – Joint Project as the <br />preferred alternative.
The URL can be used to link to this page
Your browser does not support the video tag.