My WebLink
|
Help
|
About
|
Sign Out
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
042126 REGULAR
>
Evaluation of Groundwater Supply Alternatives Within Bernal Subbasin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 10:07:54 AM
Creation date
4/14/2026 9:55:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> iii Zone 7 Water Agency <br />December, 2025 <br /> <br />TABLE OF CONTENTS TABLE OF CONTENTS <br />APPENDICES <br />Appendix A – Test Well Investigation Summary and Well Design Recommendations (Tennis Park) <br />Appendix B – Test Well Investigation Summary and Well Design Recommendations (Hansen Park) <br />Appendix C – Test Well Investigation Summary and Well Design Recommendations (Del Prado Park) <br />Appendix D – Status of Potable Water Quality Targets <br />Appendix E – Groundwater Modeling Monthly Assigned Pumping Rates <br />Appendix F – Groundwater Modeling Scenario Pumping by Well and Layer <br />Appendix G – City of Pleasanton Regional Water Supply Augmentation Project Feasibility Evaluation (30 <br />September 2025) <br />Appendix H – Project Alternative Capital Cost Estimates (Class 5) <br />Appendix I – Project Alternative O&M Cost Estimates <br />Appendix J – Basis of Design Report (BODR), 10% Design, and Construction Estimate for New Wells, Raw <br />Water Pipeline, and HCF Improvements <br />
The URL can be used to link to this page
Your browser does not support the video tag.