REGIONAL GROUNDWATER FACILITIES PROJECT <br />FEASIBILITY STUDY <br /> <br /> 3 Zone 7 Water Agency <br />December, 2025 <br /> <br />1.2. Purpose <br />The purpose of this Study is to: <br /> Identify and evaluate feasible groundwater development project alternatives capable of <br />producing a minimum of 7,000 AFY (including the City’s GPQ) under drought conditions as desired <br />by Zone 7. <br /> Assess the scope, costs, and pros/cons of wellfield configurations in terms of yield, water quality, <br />operational resilience, project capital and O&M costs, and community impacts across dry, <br />average, and wet years. <br /> Provide Zone 7 and the City with a technically and financially sound basis for selecting a preferred <br />alternative for consideration to advance to design, permitting, and construction (Phase II). <br />1.3. Approach to Study <br />The Study was structured to follow the framework outlined in Zone 7’s Regional Groundwater Facilities <br />Project RFP. Work began with exploratory drilling and aquifer testing at three candidate sites: Tennis Park, <br />Hansen Park, and Del Prado Park, to principally establish baseline production capacity and water quality <br />characterization. These results were supplemented by LSCE’s review of existing production and water quality <br />records from existing production wells in the basin, as well as groundwater modeling efforts performed by <br />Zone 7. Together, these efforts informed the development of a common set of project evaluation criteria <br />shared by Zone 7 and City leadership, and LSCE to guide comparison of project alternatives. <br />Two project evaluation criteria, groundwater production capacity and groundwater basin sustainability, <br />were treated as pass/fail requirements given target project production values and to ensure compliance <br />with Zone 7’s Alternative Groundwater Sustainability Plan (Alt GSP). Six additional criteria, including <br />capital cost, O&M costs, community and environmental impacts, water quality and treatment impacts, <br />implementation schedule, and operational flexibility, were weighted and scored to provide a transparent <br />framework for evaluation of the project alternatives. Using this framework, four alternatives were <br />advanced for detailed analysis, each representing different combinations of wells across the three <br />candidate sites. Feasibility-level capital and O&M cost estimates were developed by LSCE with support <br />from Carollo Engineers, providing the basis for comparative evaluation of alternatives and identification <br />of a preferred configuration. <br />1.4. Zone 7 / City of Pleasanton Coordination <br />Development of this Study has relied on the active support and direction of both Zone 7 and the City. <br />Coordination was carried out through online workshops, technical meetings, and project communications <br />in which Zone 7 staff, City staff, and the consultant team reviewed Phase I project data/findings, and <br />established the framework for evaluating project alternatives. Following completion of the three project <br />test wells, Zone 7 and LSCE presented the initial water-quality and production-rate results at the June 18, <br />2025 Zone 7 Board meeting. If an agreement to proceed with the regional groundwater project is reached, <br />between the Zone 7 Board and City Council, subsequent Phase II design and construction activities will be <br />initiated. Refer to Figure 2, which depicts the project communication milestones to date.