Laserfiche WebLink
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />4-68 <br /> <br /> <br />4.10.1. Discussion <br />The project area is within Augustin Bernal Park in Alameda County, under the San Francisco Bay RWQCB <br />and Hydrologic Region. Water features in or near the project area include Sinbad Creek, a tributary to <br />Arroyo de la Laguna, and an unnamed, manmade pond located within the park boundary. Both features <br />are part of the Alameda Creek Watershed, which is impaired for sediment, nutrients, and pathogens and <br />subject to Total Maximum Daily Load regulations. The area receives about 17.8 inches of annual rainfall, <br />mainly from November to April, with runoff and erosion during storms (Climate-Data.org n.d.). Elevations <br />range from 600 to 1,200 feet, with steep slopes draining toward Sinbad Creek or the Arroyo del la Laguna. <br />The site lies outside mapped groundwater basins and has limited recharge due to shallow soils and terrain. <br />4.10.1.1. Impact HYD-1 <br />Project treatments may include prescribed burning in the form of low-intensity surface fires. Ash and <br />debris from treatment areas could be washed by runoff into adjacent drainages and streams. The PEIR <br />identified the potential for any prescribed burning treatment areas to impact water quality regulations or <br />degrade water quality due to the creation of runoff which transports ash and debris as less than significant. <br />This conclusion was based on the use of low-intensity burns, the use of SPRs (e.g., setbacks and erosion <br />controls), and site-specific planning measures, such as Burn Plans. Together, these practices effectively <br />minimize the risk of violating water quality standards or causing degradation. This impact falls within the <br />scope of the PEIR because the use of pile burning and prescribed low-intensity surface fires and all <br />associated impacts to water quality are consistent with what is analyzed in the PEIR. Applicable SPRs for <br />this treatment include AD-3, AQ-3, HYD-1, HYD-4, HYD-6, and GEO-3 through GEO-7. SPR AD-3 requires <br />that the treatment design align with local plans, policies, and ordinances, while SPR AQ-3 mandates <br />preparation of a Burn Plan. SPRs GEO-3 through GEO-7 address soil stabilization, erosion monitoring, use <br />of water breaks to manage stormwater, and limiting burn pile size. SPRs HYD-1, HYD-4, and HYD-6 ensure <br />compliance with water quality regulations, require implementation of WLPZs ranging from 50 to 150 feet <br />depending on watercourse classification, and prohibit burn piles within WLPZs. <br />The inclusion of approximately 93 acres of land that is outside the CalVTP treatable landscape in the <br />proposed treatment area constitutes a change to the geographic extent presented in the PEIR. As <br />mentioned above, there are two waterbodies located within or adjacent to the project area, Sinbad Creek <br />and an unnamed manmade pond. The unnamed manmade pond is located within the project area and is <br />flooded year-round during years with average rainfall. This feature is located outside of the CalVTP <br />treatable landscape. Sinbad Creek is located less than 0.25 miles southwest of the project area and is <br />located within the CalVTP treatable landscape. The surface water conditions of the project area boundary <br />are essentially the same within and outside the treatable landscape; therefore, the water quality impact <br />from prescribed burning is also the same, as described above. This determination is consistent with the