Laserfiche WebLink
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />4-74 <br /> <br /> <br />4.11.1. Discussion <br />4.11.1.1. Impact LU-1 <br />Initial treatment and treatment maintenance activities would take place in the City in Alameda County. <br />Landowners include the City, Golden Eagle Estates, and the East Bay Regional Park District. SPR AD-3 <br />(Consistency with Local Plans, Policies, and Ordinances) requires that the project proponent design and <br />implement the treatment in a manner that is consistent with applicable local plans (e.g., general plans), <br />policies, and ordinances to the extent the Project is subject to them. The Project would be consistent with <br />the Pleasanton General Plan (City of Pleasanton 2009) and the Alameda County General Plan (Alameda <br />County 1994), which contain goals and policies relating to fire protection and wildland fire prevention. As <br />described in the project description and Section 4.12, Noise, noise-generating treatment activities would <br />occur during daytime hours and would be consistent with the local ordinances of the City and Alameda <br />County. <br />Land parcels within the treatment area are classified as “Low Density Residential,” “Agriculture,” “Single- <br />Family Residential,” and “Open Space” (City of Pleasanton n.d.). The CalVTP PEIR determined that the <br />potential for treatment activities to conflict with land use plans, policies, or regulations would result in a <br />less than significant impact because all vegetation treatments must be designed to comply with applicable <br />local, regional, and state land use requirements. The potential for vegetation treatment activities to cause <br />a significant environmental impact is within the scope of the PEIR because the treatment types and <br />activities are consistent with those evaluated in the PEIR. SPR AD-3 is applicable to the proposed project, <br />and it requires proposed project treatments to be consistent with local plans, policies, and ordinances. <br />The inclusion of approximately 93 acres of land that is outside the CalVTP treatable landscape in the <br />proposed treatment area constitutes a change to the geographic extent considered in the PEIR. However, <br />because the land uses in the project area are generally the same within and outside the treatable <br />landscape, the land use impact is also the same. Furthermore, no conflict would occur because the project <br />proponent would adhere to SPR AD-3. This determination is consistent with the PEIR and would not <br />constitute a more severe impact than that which is described in the PEIR. <br />4.11.1.2. Impact LU-2 <br />The PEIR found the impact of vegetation treatments on population growth to be less than significant <br />because the work is temporary, relies on local labor, and does not induce long-term housing or <br />infrastructure development. Impacts associated with a short-term increase in the demand for workers <br />during implementation of the treatment project are within the scope of the PEIR because the number of <br />workers required for the proposed project is consistent with the crew size analyzed in the PEIR for the <br />types of treatments proposed. Additionally, as evaluated in the PEIR, the workforce needed for project