<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />4-90 <br /> <br /> <br />4.15.1. Discussion <br />4.15.1.1. Impact UTIL-1 <br />The proposed project would include the following treatment activities: prescribed burning (pile and <br />broadcast), mechanical treatment (mowing, chipping and broadcasting vegetation), manual treatment <br />(using hand tools and hand-operated power tools such as hand saws, pole saws, McLeods, brush cutter, <br />etc.), targeted herbicide application, and biomass disposal. A minimal amount of water would be required <br />for fire suppression during prescribed and pile burning activities and for dust control during mechanical <br />treatments. Depending on the location of the prescribed burning, pile burning, or mechanical treatments, <br />water would be supplied via nearby fire hydrants or be transported via fire trucks. The CalVTP PEIR found <br />increased water demand for vegetation activities to be a less-than-significant impact because vegetation <br />treatments use minimal water and rely on existing sources without straining local supplies. The Project’s <br />impacts are consistent with those analyzed in the PEIR because the amount of water required for <br />prescribed burning and dust control is within the scope of activities and impacts determined in the PEIR. <br />Due to the minimal amount of water required for these treatment activities, there would be minimal water <br />demand on local water providers. No SPRs are applicable to this impact. This determination is consistent <br />with the PEIR and would not constitute a substantially more severe significant impact than what was <br />covered in the PEIR. <br />The proposed project includes approximately 93 acres of land that is outside the CalVTP treatable <br />landscape in the proposed treatment area, which constitutes a change to the geographic extent presented <br />in the PEIR. The conditions outside the treatable landscape area are similar to those within it, primarily <br />because they rely on the same water service providers and usage patterns. As such, the potential impacts <br />are already addressed by the PEIR and would be considered a less than significant impact. No SPRs are <br />applicable to this impact. This determination is consistent with the PEIR and would not constitute a <br />substantially more severe significant impact than what was covered in the PEIR. <br />4.15.1.2. Impact UTIL-2 <br />Mechanical and manual vegetation treatments would generate organic woody biomass as a result of <br />vegetation removal within the project treatment areas. Methods for managing biomass for the Project <br />include natural decomposition (e.g., chip and broadcast, lop and scatter), chipping and hauling, and pile <br />burning. Any biomass not broadcast on-site or pile burned would be taken off-site to an appropriate <br />biomass-processing facility, such as the Pleasanton Garbage Service, Inc. The CalVTP PEIR found that solid <br />waste generation from vegetation treatments would be less than significant because most biomass is <br />either left on-site, burned, or reused (e.g., for mulch or energy), and any waste generated is minimal and <br />managed in compliance with state disposal standards. The potential biomass impact is within the scope of