Laserfiche WebLink
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />A-5 <br /> <br /> <br />STANDARD PROJECT REQUIREMENTS APPLICABLE? <br />(Y/N) TIMING IMPLEMENTING <br />ENTITY <br />VERIFYING/ <br />MONITORING <br />ENTITY <br />For CAL FIRE projects, during contract development, CAL FIRE would include <br />access to the treated area over a prescribed period (usually up to 3 years) to <br />assess treatment effectiveness in achieving desired fuel conditions and other <br />CalVTP objectives as well as any necessary maintenance, as a contract term for <br />consideration by the landowner. For public landowners, access to the treated <br />area over a prescribed period would be a requirement of the executed contract. <br />This SPR applies to all treatment activities and all treatment types, including <br />treatment maintenance. <br />SPR AD-9: Obtain a Coastal Development Permit for Proposed Treatment <br />Within the Coastal Zone Where Required <br />When planning a treatment project within the Coastal Zone, the project <br />proponent would contact the local Coastal Commission district office, or <br />applicable local government to determine if the Project area is within the <br />jurisdiction of the Coastal Commission, a local government with a certified Local <br />Coastal Program (LCP), or both. All treatment projects in the Coastal Zone would <br />be reviewed by the local Coastal Commission district office or local government <br />with a certified LCP (in consultation with the local Coastal Commission district <br />office regarding whether a Coastal Development Permit [CDP] is required). If a <br />CDP is required, the treatment project would be designed to meet the following <br />conditions: <br />i. The treatment project would be designed in compliance with applicable <br />provisions of the Coastal Act that provide substantive performance <br />standards for the protection of potentially affected coastal resources, if <br />the treatment activity would occur within the original jurisdiction of the <br />Commission or an area of a local coastal government without a certified <br />LCP; and <br />ii. The treatment project would be designed in compliance with the <br />applicable provisions of the certified LCP, specifically the substantive <br />performance standards for the protection of potentially affected coastal <br />resources, if the treatment activity would occur within the jurisdiction of <br />a local coastal government with a certified LCP. <br />Initial <br />Treatment: N <br />Treatment <br />Maintenance: <br />N <br />N/A N/A N/A