Laserfiche WebLink
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />A-17 <br /> <br /> <br />STANDARD PROJECT REQUIREMENTS APPLICABLE? <br />(Y/N) TIMING IMPLEMENTING <br />ENTITY <br />VERIFYING/ <br />MONITORING <br />ENTITY <br />The project proponent would require crew members and contractors to receive <br />training from a qualified RPF or biologist prior to beginning a treatment project. <br />The training would describe the appropriate work practices necessary to <br />effectively implement the biological SPRs and mitigation measures and to comply <br />with the applicable environmental laws and regulations. The training would <br />include the identification, relevant life history information, and avoidance of <br />pertinent special-status species; identification and avoidance of sensitive natural <br />communities and habitats with the potential to occur in the treatment area; <br />impact minimization procedures; and reporting requirements. The training would <br />instruct workers when it is appropriate to stop work and allow wildlife <br />encountered during treatment activities to leave the area unharmed and when it <br />is necessary to report encounters to a qualified RPF, biologist, or biological <br />technician. The qualified RPF, biologist, or biological technician would <br />immediately contact CDFW or USFWS, as appropriate, if any wildlife protected by <br />CESA or ESA is encountered and cannot leave the site on its own (without being <br />handled). This SPR applies to all treatment activities and treatment types, <br />including treatment maintenance. <br />Sensitive Natural Communities and Other Sensitive Habitats <br />SPR BIO-3: Survey Sensitive Natural Communities and Other Sensitive Habitats <br />If SPR BIO-1 determines that sensitive natural communities or sensitive habitats <br />may be present and adverse effects cannot be avoided, the project proponent <br />would: <br />• Require a qualified RPF or biologist to perform a protocol-level survey <br />following the most current CDFW protocols (CDFW 2023a) of the <br />treatment area prior to the start of treatment activities for sensitive <br />natural communities and sensitive habitats <br />o Sensitive natural communities would be identified using the <br />best means possible, including keying them out using the most <br />current edition of A Manual of California Vegetation (including <br />updated natural communities data; CNPS 2023) or referring to <br />relevant reports (e.g., reports found on the Vegetation <br />Classification and Mapping Program website) <br />Initial <br />Treatment: Y <br />Treatment <br />Maintenance: <br />Y <br />Prior to <br />treatment and <br />treatment <br />maintenance <br />The City of <br />Pleasanton <br />The City of <br />Pleasanton