Laserfiche WebLink
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />2-1 <br /> <br /> <br />2.0 PROJECT DESCRIPTION <br />The proposed project would create and maintain a 162-acre reduced fuel zone in the San Francisco East <br />Bay within and adjacent to Augustin Bernal Community Park, located in the high fire hazard severity zone <br />on Pleasanton Ridge in Alameda County, California (Figures 1 and 2). The Project would be implemented <br />on land owned and/or managed by the City, Golden Eagle Estates, and East Bay Regional Park District at <br />elevations between approximately 600 feet and 1620 feet. The Project is within Augustin Bernal <br />Community Park, adjacent to the unincorporated community of Kilkare Woods, and the neighborhoods of <br />Golden Eagle Estates and The Club at Castlewood. The Project starts southwest of the City of Pleasanton, <br />Alameda County, from the start of Long View Tr ail between Longview Drive and Longview Lane, extending <br />southeast to the Golden Eagle Trail entrance off Golden Eagle Way, adjacent to Castlewood Country Club, <br />then expanding west to the top of Pleasanton Ridge. A small section of the western portion of the Project <br />is within the East Bay Regional Park District ’s Pleasanton Ridge Regional Park. <br />While the project footprint includes 69.5 acres of land mapped as treatable landscape by the CalVTP, it <br />also includes 92.5 acres not included in the CalVTP treatable landscape (Figure 3). Treatment types and <br />treatment activities would be consistent throughout the project footprint regardless of whether it has <br />been mapped as treatable landscape. Treatment types and activities would be contingent upon site <br />conditions, accessibility, and fuels management needs to achieve the shaded fuel break. This project <br />proposes two treatment types consistent with the CalVTP PEIR: fuel breaks and WUI fuel reduction. The <br />Project’s proposed treatment activities would be consistent with those described in the CalVTP PEIR: <br />manual treatment, mechanical treatment, prescribed burning (broadcast and pile), prescribed herbivory, <br />and herbicide (spot treatment). <br />The project footprint and surrounding area have a wildfire hazard risk that is considered by CAL FIRE to be <br />“high” to “very high.” Wildfire hazard risk is attributed to widespread invasive, noxious, fire-hazardous <br />vegetation; decades of dead vegetation accumulation; over a century of fire suppression; and the <br />increased risk of anthropogenic ignition associated with dense urban development (CAL FIRE 2023). The <br />desired result of the Project is to restore fuel loads to more natural levels that can be maintained through <br />prescribed fire and other methods. The Project would reduce excess and ladder fuels within an <br />approximately 200-foot-wide shaded fuel break and WUI, creating safer fire road access for first <br />responders and community members. <br />The Project follows a route throughout the landscape that supports a strategic approach to wildfires in the <br />WUI. Project implementation would not stop fire spread during periods of strong, warm, downslope winds <br />with low relative humidity (i.e., Foehn winds), when pieces of burning material can be blown across fuel <br />breaks. However, the Project would provide safer access and a point from which firefighting resources can <br />“anchor” to conduct suppression activities, and it would increase the construction rate of fire lines while