My WebLink
|
Help
|
About
|
Sign Out
RES 2026023
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 9:30:47 AM
Creation date
4/28/2026 9:58:51 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RESO NO. 2026-023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />A-96 <br /> <br /> <br />MITIGATION MEASURES APPLICABLE? <br />(Y/N) TIMING IMPLEMENTING <br />ENTITY <br />VERIFYING/ <br />MONITORING <br />ENTITY <br />described in Van Wagtendonk et al. 2018 and Sawyer, Keeler-Wolf, and Evens <br />2009 or current version, including updated natural communities data online) <br />• Time prescribed herbivory to occur when non-target vegetation is not susceptible <br />to damage (e.g., non-target vegetation is dormant or has completed its <br />reproductive cycle for the year) <br />o For example, use herbivores to control invasive plants growing in <br />sensitive habitats or sensitive natural communities when sensitive <br />vegetation is dormant but invasive plants are growing <br />o Timing of herbivory to avoid non-target vegetation would be <br />determined by a qualified botanist, RPF, or biologist based on the <br />specific vegetation alliance being treated, the life forms and life <br />conditions of its characteristic plant species, and the sensitivity of the <br />non-target vegetation to the effects of herbivory <br />The feasibility of implementing the avoidance measures would be determined by the <br />project proponent based on whether implementation of this MM would preclude <br />completing the treatment project within the reasonable period of time necessary to meet <br />CalVTP program objectives, including but not limited to protection of vulnerable <br />communities. If the avoidance measures are determined by the project proponent to be <br />infeasible, the project proponent would document the reasons implementation of the <br />avoidance strategies are infeasible in the PSA. After completion of the PSA and prior to or <br />during treatment implementation, if there is any change in the feasibility of avoidance <br />strategies from those explained in the PSA, this would be documented in the post-project <br />implementation report (referred to by CAL FIRE as a Completion Report).
The URL can be used to link to this page
Your browser does not support the video tag.