My WebLink
|
Help
|
About
|
Sign Out
RES 2026023
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 9:30:47 AM
Creation date
4/28/2026 9:58:51 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RESO NO. 2026-023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sequoia Ecological Consulting,Inc. <br /> CaIVTP Project-Specific Analysis and Addendum <br /> Augustin Bernal Community Park Fuel Reduction C-20 <br /> .) November 2025 <br /> equipment. In addition to applicable CaIVTP SPRs and MMs,the measures described to prevent the spread of SOD <br /> would be implemented. <br /> PD-3.6:Treatment Maintenance <br /> The City would monitor the treated areas for maintenance of desired vegetation conditions ("treatment <br /> maintenance," per the CaIVTP PEIR). The City would work with homeowner associations, Firewise USA <br /> Neighborhoods, and high-risk neighborhoods to identify areas for priority in treatment maintenance to ensure <br /> that the defensible space is maintained for maximum benefit.Timing between maintenance activities would vary <br /> by habitat type, by changing site condition, and as determined by a professional. In forested areas, treatment <br /> maintenance may occur every 3 to 5 years. In brush-dominated areas, treatment maintenance such as herbivory <br /> may occur every 1 to S years.In grassland areas or areas where initial treatments were primarily manual,treatment <br /> maintenance may occur annually. <br /> Maintenance treatments are anticipated to follow the same methods as initial treatments but are subject to <br /> change depending on site response to initial treatment. For example, at locations where intensive vegetation <br /> removal (e.g., prescribed burning) occurred, treatment maintenance may use lower-intensity manual treatment <br /> activities in subsequent years. Because vegetation communities are dynamic, treatment activities would be <br /> modified to reflect changes. <br /> Throughout the treatment maintenance period, the City would consider the continued relevance of the Project- <br /> Specific Analysis (PSA). Where the City determines that the PSA is no longer sufficiently relevant, the City would <br /> determine whether a new PSA or other environmental analysis is warranted. If more than 10 years pass since <br /> approval of the latest PSA update, the City would review the PSA for its applicability to current conditions. For <br /> example,the City would conduct a reconnaissance survey to verify that conditions are substantially similar to those <br /> anticipated in the PSA.Any updates would be documented. <br />
The URL can be used to link to this page
Your browser does not support the video tag.