Laserfiche WebLink
\ Sequoia Ecological Consulting,Inc. <br /> CatVTP Project-Specific Analysis and Addendum <br /> C-31 <br /> Augustin Bernal Community Park Fuel Reduction <br /> November 2025 <br /> FINDINGS FOR SIGNIFICANT AND UNAVOIDABLE IMPACTS <br /> The CaIVTP (Program) PEIR determined that some impacts of the Program would be significant and unavoidable, <br /> even after implementation of all feasible mitigation.The Project Proponent finds that the treatment project would <br /> contribute to or cause the following significant and unavoidable impacts as indicated. Incorporating and <br /> implementing the following MMs indicated to be applicable to the treatment project will reduce the severity of <br /> this impact, but not to a less-than-significant level. The Project Proponent hereby directs that these MMs be <br /> adopted.The Project Proponent therefore finds that changes or alterations have been required in,or incorporated <br /> into, the treatment project that will substantially lessen, but not avoid, the significant environmental effect as <br /> identified in the PEIR and PSA. <br /> The Project Proponent finds that fully mitigating these impacts is not feasible;there are no feasible MMs beyond <br /> the MMs indicated below to reduce these impacts. These impacts will remain significant and unavoidable. The <br /> Project Proponent concludes, however, that the benefits of the CaIVTP and the vegetation treatment project <br /> outweigh the significant unavoidable impacts of the Program and treatment project, as set forth in the Board's <br /> Statement of Overriding Considerations. <br /> Air Quality <br /> ❑X Impact AQ-1: Generate Emissions of Criteria Air Pollutants and Precursors during Treatment Activities that <br /> Would Exceed CAAQS Or NAAQS and Conflict with Regional Air Quality Plans <br /> ❑X MM AQ-1: Implement On-Road Vehicle and Off-Road Equipment Exhaust Emission Reduction Techniques <br /> Implementation of MM AQ-1 was required or incorporated into the CaIVTP by the Board to reduce the severity of <br /> this impact, but it was not feasible to attain a less-than-significant level.The Project Proponent would implement <br /> the emission reduction techniques included in MM AQ-1 to the extent feasible. However, because the treatments <br /> would be implemented by a public agency with limited funding, procuring or paying additional amounts for <br /> contractors that use equipment meeting the latest efficiency standards,including meeting the EPA's Tier 4 emission <br /> standards, using renewable diesel fuel, using electric- and gasoline-powered equipment, and using equipment <br /> with Best Available Control Technology may be cost prohibitive. Carpooling would be encouraged by the Project <br /> Proponent, but because crews may not all be employed with the same company, carpooling may not be feasible <br /> to implement for most of the workers. The Project Proponent will document the extent the agency and/or its <br /> contractors are able to implement MM AQ-1. Renewable diesel will be used by the Project Proponent and/or its <br /> contractors to the extent required by state regulations. The Project Proponent incorporated all feasible and <br /> applicable measures to prevent and minimize this potential impact, pursuant to SPRs AQ-1,AQ-4, and AQ-6. The <br /> Project Proponent finds that mitigating this impact below a level of significance is not feasible. The Project <br /> Proponent concludes, however, that the benefits of the CaIVTP and proposed project outweigh the significant <br /> unavoidable impacts of the Program and proposed vegetation treatment project,as set forth in the Statement of <br /> Overriding Considerations, below. The Project Proponent therefore finds that changes or alterations that will <br />