Laserfiche WebLink
Sequoia Ecological Consulting,Inc. <br /> CaIVTP Project-Specific Analysis and Addendum111111 C 34 <br /> Augustin Bernal Community Park Fuel Reduction <br /> J November 2025 <br /> The Project Proponent finds that GHG emissions from the use of vehicles and mechanical equipment, prescribed <br /> herbivory, herbicide application, and prescribed burning during initial and maintenance treatments cannot be <br /> avoided because they are necessary for effective treatments. Implementation of MM GHG-2 would reduce GHG <br /> emissions associated with pile burning by burning when fuels have a higher fuel moisture content, reducing the <br /> total area burned by mosaic burning and isolating and leaving large fuels unburned, and by scheduling burns <br /> before new fuels appear. Treatment activities would contribute to annual GHG emissions generated under the <br /> CaIVTP. Methods for reducing GHG emissions from burns would be integrated into SPR AQ-3 (Burn Plan), as <br /> described in MM GHG-2.The Project Proponent incorporated all feasible and applicable measures to prevent and <br /> minimize this potential impact, pursuant to MM GHG-2. The Project Proponent finds that mitigating this impact <br /> below a level of significance is not feasible. The Project Proponent concludes, however, that the benefits of the <br /> CaIVTP and the proposed project outweigh the significant unavoidable impacts of the Program and the proposed <br /> vegetation treatment project, as set forth in the Statement of Overriding Considerations, below. <br /> Transportation <br /> Impact TRAN-3: Result in a Net Increase in vehicle miles traveled(VMT)for the Proposed CaIVTP <br /> DX MM AQ-1: Implement On-Road Vehicle and Off-Road Equipment Exhaust Emission Reduction Techniques <br /> Although the PEIR determined that individual vegetation treatments would likely be less than significant, the <br /> overall impact was identified as potentially significant and unavoidable in the PEIR because implementation of the <br /> CaIVTP would result in a net increase in VMT attributable to the Program as a whole. Because the project would <br /> generate VMT during implementation, it would contribute to the environmental significance conclusion in the <br /> PEIR; therefore, this impact is considered significant and unavoidable. No SPRs apply to this impact. The Project <br /> Proponent would implement MM AQ-1 to the extent feasible. MM AQ-1 would reduce the impact by encouraging <br /> workers to carpool and/or use public transportation. However, due to the required equipment and number of <br /> employees (i.e.,the primary trip-generators associated with vegetation treatments)associated with the project, it <br /> would not be feasible to reduce VMT substantially.The Project Proponent incorporated all feasible and applicable <br /> measures to prevent and minimize this potential impact. The Project Proponent finds that mitigating this impact <br /> below a level of significance is not feasible. The Project Proponent concludes, however, that the benefits of the <br /> CaIVTP and the proposed project outweigh the significant unavoidable impacts of the Program and the proposed <br /> vegetation treatment project, as set forth in the Statement of Overriding Considerations, below. <br />