My WebLink
|
Help
|
About
|
Sign Out
RES 2026023
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 9:30:47 AM
Creation date
4/28/2026 9:58:51 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RESO NO. 2026-023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />3-4 <br /> <br /> <br />10. Native American Consultation: <br />For treatment projects that are within the scope of the CalVTP PEIR, consultation for Assembly Bill <br />52 compliance has been completed. The Board of Forestry and Fire Protection conducted <br />consultation pursuant to Public Resources Code (PRC) Section 21080.3.1 during preparation of the <br />PEIR. For treatment projects with impacts not within the scope of the PEIR, pursuant to PRC Sections <br />21080.3.1, 21080.3.2, and 21082.3, project partners preparing a new negative declaration, <br />mitigated negative declaration, or EIR must notify any California Native American Tribe who has <br />submitted written request for notification of a project in the area of the treatment site. Upon <br />written request for consultation by a Tribe, the project partners must begin consultation before the <br />release of the environmental document and must follow the requirements of the cited PRC sections. <br />Pursuant to CalVTP SPR CUL-2, an updated Native American contact list and sacred lands file search <br />was obtained from the Native American Heritage Commission (NAHC). The sacred lands data file <br />indicated that no sacred sites occur within the project area or adjacent lands. On July 2, 2025, letters <br />were sent via email to each of the 27 Tribal contacts provided by the NAHC that requested any <br />additional information regarding Tribal resources and to notify the City if they wished to initiate <br />consultation regarding the Project actions. As of the filing date, four responses have been <br />received—two requesting consultation and two confirming receipt. As planning proceeds, the City <br />would continue to consult with interested Tribal representatives regarding the Project and <br />incorporate their concerns into Project planning and mitigation as warranted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.