My WebLink
|
Help
|
About
|
Sign Out
RES 2026023
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2026 9:30:47 AM
Creation date
4/28/2026 9:58:51 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/21/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RESO NO. 2026-023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Sequoia Ecological Consulting, Inc. <br />CalVTP Project-Specific Analysis and Addendum <br />Augustin Bernal Community Park Fuel Reduction <br />November 2025 <br />4-1 <br /> <br /> <br />4.0 PROJECT-SPECIFIC ANALYSIS AND ADDENDUM <br />4.1. Aesthetics and Visual Resources <br />Table 1. Consistency of project-related aesthetics and visual resources impacts with the scope of the California Vegetation Treatment Program <br />Programmatic Environmental Impact Report. <br />Impact in the PEIR Project-Specific Checklist <br />Environmental Impact Covered in <br />the PEIR <br />Identify <br />Impact <br />Significance <br />in the PEIR <br />Identify <br />Location of <br />Impact <br />Analysis in <br />the PEIR <br />Does the <br />Impact <br />Apply to <br />the <br />Treatment <br />Project? <br />List SPRs <br />Applicable <br />to the <br />Treatment <br />Project1 <br />List MMs <br />Applicable <br />to the <br />Treatment <br />Project1 <br />Identify <br />Impact <br />Significance <br />for <br />Treatment <br />Project <br />Would This <br />Be a <br />Substantially <br />More Severe <br />Significant <br />Impact than <br />Identified in <br />the PEIR? <br />Is This <br />Impact <br />within the <br />Scope of <br />the PEIR? <br />Would the project: <br />Impact AES-1: Result in Short- Term, <br />Substantial Degradation of a Scenic <br />Vista or Visual Character or Quality <br />of Public Views, or Damage to Scenic <br />Resources in a State Scenic Highway <br />from Treatment Activities <br />LTS <br />Impact AES-1, <br />pp. 3.2-16– <br />3.2-19 <br />Yes <br />AD-4, AES- <br />2, AQ-2, <br />AQ-3, REC- <br />1 <br />NA LTS No Yes <br />Impact AES-2: Result in Long-Term, <br />Substantial Degradation of a Scenic <br />Vista or Visual Character or Quality <br />of Public Views, or Damage to Scenic <br />Resources in a State Scenic Highway <br />from Wildland Urban Interface Fuel <br />Reduction, Ecological Restoration, or <br />Shaded Fuel Break Treatment Types <br />LTS <br />Impact AES- <br />2,pp. 3.2-20– <br />3.2-25 <br />Yes <br />AD-4, REC- <br />1, AES-1, <br />AES-2, AES- <br />3 <br />NA LTS No Yes
The URL can be used to link to this page
Your browser does not support the video tag.